An Innovative ELS System on Recently Reclaimed Land – Design and Analysis

The Third Runway at Hong Kong International Airport sits on a newly reclaimed land formed by non-dredged method where soft muds remain in place under the reclamation fill. Ground improvement works mainly in the form of Deep Cement Mixing (DCM) were installed within the soft marine clays with embedment into a competent stratum. The APM and BHS tunnels were proposed along the new artificial shoreline. To enable the construction of the cut-and-cover tunnels, it is viable to have an open-cut excavation at landside because of the abundant space. At seaside where space constraints are present, a double-wall system was introduced to retain the earth. The beauty of this system is a strut-free zone can be created, which minimizes the construction constraints and shortens the construction programme significantly. A double-wall system is composed of continuous front wall and discrete back wall connected by steel ties. The front wall relies on the back wall which is anchored into DCM panels. The spacing between the front wall and the back wall varies from 9m to 15m depending on site constraints. The design approach and failure mechanisms are discussed.

Authors

Institutions

Publication Details

Journal
AIJR Proceedings
Published
2024-10-07
DOI
https://doi.org/10.21467/proceedings.171.31
Primary Topic
3D Modeling in Geospatial Applications
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Innovative ELS System on Recently Reclaimed Land – Design and Analysis

Gavin S. H. Toh, C. N. Ho, Jack Yiu, Tom S. K. Chan et al.
AIJR Proceedings
3D Modeling in Geospatial Applications
article

An Innovative ELS System on Recently Reclaimed Land – Design and Analysis

Gavin S. H. Toh, C. N. Ho, Jack Yiu, Tom S. K. Chan, Chris C. F. Shum, Oscar Y. N. Tse
article en

Abstract

The Third Runway at Hong Kong International Airport sits on a newly reclaimed land formed by non-dredged method where soft muds remain in place under the reclamation fill. Ground improvement works mainly in the form of Deep Cement Mixing (DCM) were installed within the soft marine clays with embedment into a competent stratum. The APM and BHS tunnels were proposed along the new artificial shoreline. To enable the construction of the cut-and-cover tunnels, it is viable to have an open-cut excavation at landside because of the abundant space. At seaside where space constraints are present, a double-wall system was introduced to retain the earth. The beauty of this system is a strut-free zone can be created, which minimizes the construction constraints and shortens the construction programme significantly. A double-wall system is composed of continuous front wall and discrete back wall connected by steel ties. The front wall relies on the back wall which is anchored into DCM panels. The spacing between the front wall and the back wall varies from 9m to 15m depending on site constraints. The design approach and failure mechanisms are discussed.

AIJR Proceedings
Lambeth Hospital (GB)
Hong Kong International Airport
Openalex Percentile: Top 69%
3D Modeling in Geospatial Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.