A New Era of Underground Construction in Hong Kong – From Ground Investigation to Construction

In order to support the sustainable development in Hong Kong, the Drainage Services Department (DSD) commenced the project ‘Relocation of Sha Tin Sewage Treatment Works to Caverns’. The first stage of construction for Main Access Tunnel was commenced in February 2019 and completed in April 2022 under Contract No. DC/2018/05. The excavation of main caverns to accommodate the sewage treatment facilities is on-going under Contract No. DC/2020/05. The paper first highlights the comprehensive ground investigation in planning stage. Advanced ground investigation techniques, including horizontal directional coring, surface geophysics tests, downhole geophysical logging, over-coring and hydraulic fracturing tests were carried out. The paper also briefly mentions the rock support design of MAT using rock reinforcement approach. The construction phase involves the installation of permanent rock bolts and shotcrete lining, implementation and utilisation of innovative and advanced technologies in drill-and-blast excavation with advanced sensors, surveying data with 3D laser scanner, and real-time monitoring via 5G network. These have allowed the team to conduct study on ground parameters, review of blasting design, continuous monitoring on excavation progress and quality control on site. The MAT construction under Contract No. DC/2018/05 represents a significant milestone in tunnel construction in Hong Kong. It showcases the integration of geotechnical expertise, innovative engineering, and meticulous construction practices. This paper provides an overview and valuable insights in shaping the future and usher in a new era of underground construction in Hong Kong.

Authors

Institutions

Publication Details

Journal
AIJR Proceedings
Published
2024-10-07
DOI
https://doi.org/10.21467/proceedings.171.10
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A New Era of Underground Construction in Hong Kong – From Ground Investigation to Construction

Franklin K. L. To, Bridges Guy D. C., Suet Yi Leung, Minsoo Choi
AIJR Proceedings
Underground infrastructure and sustainability
article

A New Era of Underground Construction in Hong Kong – From Ground Investigation to Construction

Franklin K. L. To, Bridges Guy D. C., Suet Yi Leung, Minsoo Choi
article en

Abstract

In order to support the sustainable development in Hong Kong, the Drainage Services Department (DSD) commenced the project ‘Relocation of Sha Tin Sewage Treatment Works to Caverns’. The first stage of construction for Main Access Tunnel was commenced in February 2019 and completed in April 2022 under Contract No. DC/2018/05. The excavation of main caverns to accommodate the sewage treatment facilities is on-going under Contract No. DC/2020/05. The paper first highlights the comprehensive ground investigation in planning stage. Advanced ground investigation techniques, including horizontal directional coring, surface geophysics tests, downhole geophysical logging, over-coring and hydraulic fracturing tests were carried out. The paper also briefly mentions the rock support design of MAT using rock reinforcement approach. The construction phase involves the installation of permanent rock bolts and shotcrete lining, implementation and utilisation of innovative and advanced technologies in drill-and-blast excavation with advanced sensors, surveying data with 3D laser scanner, and real-time monitoring via 5G network. These have allowed the team to conduct study on ground parameters, review of blasting design, continuous monitoring on excavation progress and quality control on site. The MAT construction under Contract No. DC/2018/05 represents a significant milestone in tunnel construction in Hong Kong. It showcases the integration of geotechnical expertise, innovative engineering, and meticulous construction practices. This paper provides an overview and valuable insights in shaping the future and usher in a new era of underground construction in Hong Kong.

AIJR Proceedings
AECOM (China) (CN)
Drainage Services Department
Openalex Percentile: Top 69%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.