Baqubah city is supplied by an integrated electrical grid system, starting with a high voltage of 400 kV, then distributed to a low voltage of 132 kV, and then to 33 kV in Baqubah city and the eastern and western zones, each of which consists of two sectors. These zones are distributed among the city's various land uses (residential, industrial, commercial, and governmental). The city also has a population of 128,064 in the eastern zone and 148,449 in the western zone. This network provides a centralized, scheduled power supply service to these uses, where the Electricity Directorate determines the hours of power outages and supply throughout the day, taking into account some urban uses within the city via an emergency line, such as hospitals and central service departments in the governorate administration. The city's need reached (465.51) MW and the supply reached (232.76) MW, which means that there is an energy deficit of (59)%.Baqubah city is supplied by an integrated electrical grid system, starting with a high voltage of 400 kV, then distributed to a low voltage of 132 kV, and then to 33 kV in Baqubah city and the eastern and western zones, each of which consists of two sectors. These zones are distributed among the city's various land uses (residential, industrial, commercial, and governmental). The city also has a population of 128,064 in the eastern zone and 148,449 in the western zone. This network provides a centralized, scheduled power supply service to these uses, where the Electricity Directorate determines the hours of power outages and supply throughout the day, taking into account some urban uses within the city via an emergency line, such as hospitals and central service departments in the governorate administration. The city's need reached (465.51) MW and the supply reached (232.76) MW, which means that there is an energy deficit of (59) %.

Authors

Institutions

Publication Details

Journal
Edelweiss Applied Science and Technology
Published
2025-05-14
DOI
https://doi.org/10.55214/25768484.v9i5.7174
Primary Topic
Electricity Theft Detection Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The electrical transmission and distribution network in the sectors of Baqubah city

Mohammed Hussein IBRAHIM, Mohammad Yusuf Hajim Al-Hiti
Edelweiss Applied Science and Technology
Electricity Theft Detection Techniques
article

The electrical transmission and distribution network in the sectors of Baqubah city

Mohammed Hussein IBRAHIM, Mohammad Yusuf Hajim Al-Hiti
article en

Abstract

Baqubah city is supplied by an integrated electrical grid system, starting with a high voltage of 400 kV, then distributed to a low voltage of 132 kV, and then to 33 kV in Baqubah city and the eastern and western zones, each of which consists of two sectors. These zones are distributed among the city's various land uses (residential, industrial, commercial, and governmental). The city also has a population of 128,064 in the eastern zone and 148,449 in the western zone. This network provides a centralized, scheduled power supply service to these uses, where the Electricity Directorate determines the hours of power outages and supply throughout the day, taking into account some urban uses within the city via an emergency line, such as hospitals and central service departments in the governorate administration. The city's need reached (465.51) MW and the supply reached (232.76) MW, which means that there is an energy deficit of (59)%.Baqubah city is supplied by an integrated electrical grid system, starting with a high voltage of 400 kV, then distributed to a low voltage of 132 kV, and then to 33 kV in Baqubah city and the eastern and western zones, each of which consists of two sectors. These zones are distributed among the city's various land uses (residential, industrial, commercial, and governmental). The city also has a population of 128,064 in the eastern zone and 148,449 in the western zone. This network provides a centralized, scheduled power supply service to these uses, where the Electricity Directorate determines the hours of power outages and supply throughout the day, taking into account some urban uses within the city via an emergency line, such as hospitals and central service departments in the governorate administration. The city's need reached (465.51) MW and the supply reached (232.76) MW, which means that there is an energy deficit of (59) %.

Edelweiss Applied Science and TechnologyVol. 9(5)
University of Diyala (IQ)
Openalex Percentile: Top 91%
Electricity Theft Detection Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The electrical transmission and distribution network in the sectors of Baqubah city — Mohammed Hussein IBRAHIM, Mohammad Yusuf Hajim Al-Hiti · Edelweiss Applied Science and Technology (2025) | TGRS Research Map | TGRS