Effect of Stakeholders’ Participation on Performance of Poverty Alleviation Coalition (PAC) Project in Rwanda; A Case of Caritas Rwanda in Nyabiheke Refugee Camp from Gatsibo District

A common cause of project failure is the inadequate involvement of key stakeholders, leading to poor communication, mistrust, and a lack of support from those most affected by the project. This study examines the impact of stakeholder participation on the performance of the Poverty Alleviation Coalition (PAC) Project implemented by Caritas Rwanda at Nyabiheke Refugee Camp in Gatsibo District, Rwanda. Drawing on several theories, including stakeholder theory, social exchange theory, and communicative action theory, the study employs a survey questionnaire to collect primary data from 245 respondents out of a targeted 247, consisting of staff, project partners, and beneficiaries. The research applies quantitative methods, using descriptive statistics and multiple regression analysis via SPSS to examine the correlation between variables such as stakeholder salience, risk appetite, communication, and consultation with the performance of the PAC project. The findings reveal a strong positive correlation between stakeholder salience, communication, consultation, and project performance. However, no significant effect was found for stakeholder risk appetite. Additionally, issues such as high stakeholder urgency causing delays, lack of communication about project direction and risks, and insufficient consultation with beneficiaries were identified, all contributing to underperformance. The study recommends that Caritas Rwanda and project managers improve stakeholder communication and consultation throughout all project phases to enhance stakeholder engagement and ensure better project outcomes.

Authors

Publication Details

Published
2025-05-17
DOI
https://doi.org/10.38124/ijisrt/25may113
Primary Topic
Public Procurement and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Stakeholders’ Participation on Performance of Poverty Alleviation Coalition (PAC) Project in Rwanda; A Case of Caritas Rwanda in Nyabiheke Refugee Camp from Gatsibo District

Tunezerwe Emmanuel, Samuel Wabala, Janvière Mugoragoze
Public Procurement and Policy
article

Effect of Stakeholders’ Participation on Performance of Poverty Alleviation Coalition (PAC) Project in Rwanda; A Case of Caritas Rwanda in Nyabiheke Refugee Camp from Gatsibo District

Tunezerwe Emmanuel, Samuel Wabala, Janvière Mugoragoze
article en

Abstract

A common cause of project failure is the inadequate involvement of key stakeholders, leading to poor communication, mistrust, and a lack of support from those most affected by the project. This study examines the impact of stakeholder participation on the performance of the Poverty Alleviation Coalition (PAC) Project implemented by Caritas Rwanda at Nyabiheke Refugee Camp in Gatsibo District, Rwanda. Drawing on several theories, including stakeholder theory, social exchange theory, and communicative action theory, the study employs a survey questionnaire to collect primary data from 245 respondents out of a targeted 247, consisting of staff, project partners, and beneficiaries. The research applies quantitative methods, using descriptive statistics and multiple regression analysis via SPSS to examine the correlation between variables such as stakeholder salience, risk appetite, communication, and consultation with the performance of the PAC project. The findings reveal a strong positive correlation between stakeholder salience, communication, consultation, and project performance. However, no significant effect was found for stakeholder risk appetite. Additionally, issues such as high stakeholder urgency causing delays, lack of communication about project direction and risks, and insufficient consultation with beneficiaries were identified, all contributing to underperformance. The study recommends that Caritas Rwanda and project managers improve stakeholder communication and consultation throughout all project phases to enhance stakeholder engagement and ensure better project outcomes.

Openalex Percentile: Top 84%
Public Procurement and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.