Project Delivery Systems and Project Performance: A Causal Relationship Analysis of Indonesian Stakeholders

Background The Indonesian construction industry is a key factor that drives economic growth, but it is plagued by unresolved project delivery issues that can yield lower levels of project performance. Project delivery systems (PDSs) have faced traditional barriers to successful projects. This study aimed to demonstrate how each stakeholder manages and participates in the activities of PDSs and how different factors affect project performance. It further explored the multifaceted association between individual aspects of PDSs and overall project performance. Materials and Methods A comprehensive literature review identified nine aspects of PDS and nine project performance indicators. A questionnaire was used to gather data clarifying the relationship between PDSs attributes and project performance, as analyzed through multivariate regression according to stakeholder input. Results The results showed that the dependence on the design-bid-build (DBB) model of PDSs in Indonesia is quite high. It was found that PDSs should provide justification for their choice of cooperation contract model, particularly regarding compensation and rewards, as these factors significantly affect cost performance (β 0.850, p -value 0.0312*) based on the owner's point of view. Discussion The unexplored pre-construction phase might reduce numerous risks in Indonesia‘s construction. It was found that Indonesia's construction industry lacks IPDS contractual norms and that DBB PDS operates poorly. Conclusion The findings require further investigation, which is essential for stakeholders and Indonesian regulators, highlighting the need for optimal PDS management to improve building construction performance in the Indonesian context. They also aid in refining contracts and clarifying the scope of construction projects.

Authors

Institutions

Publication Details

Journal
The Open Construction and Building Technology Journal
Published
2025-04-29
DOI
https://doi.org/10.2174/0118748368388018250428092847
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Delivery Systems and Project Performance: A Causal Relationship Analysis of Indonesian Stakeholders

Aswin Indraprastha, F M Siregar, Dewi Larasati
The Open Construction and Building Technology Journal
Construction Project Management and Performance
article

Project Delivery Systems and Project Performance: A Causal Relationship Analysis of Indonesian Stakeholders

Aswin Indraprastha, F M Siregar, Dewi Larasati
article en

Abstract

Background The Indonesian construction industry is a key factor that drives economic growth, but it is plagued by unresolved project delivery issues that can yield lower levels of project performance. Project delivery systems (PDSs) have faced traditional barriers to successful projects. This study aimed to demonstrate how each stakeholder manages and participates in the activities of PDSs and how different factors affect project performance. It further explored the multifaceted association between individual aspects of PDSs and overall project performance. Materials and Methods A comprehensive literature review identified nine aspects of PDS and nine project performance indicators. A questionnaire was used to gather data clarifying the relationship between PDSs attributes and project performance, as analyzed through multivariate regression according to stakeholder input. Results The results showed that the dependence on the design-bid-build (DBB) model of PDSs in Indonesia is quite high. It was found that PDSs should provide justification for their choice of cooperation contract model, particularly regarding compensation and rewards, as these factors significantly affect cost performance (β 0.850, p -value 0.0312*) based on the owner's point of view. Discussion The unexplored pre-construction phase might reduce numerous risks in Indonesia‘s construction. It was found that Indonesia's construction industry lacks IPDS contractual norms and that DBB PDS operates poorly. Conclusion The findings require further investigation, which is essential for stakeholders and Indonesian regulators, highlighting the need for optimal PDS management to improve building construction performance in the Indonesian context. They also aid in refining contracts and clarifying the scope of construction projects.

The Open Construction and Building Technology JournalVol. 19(1)
Bandung Institute of Technology (ID), Telkom University (ID)
Institut Teknologi Bandung
Openalex Percentile: Top 88%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.