A study on Improving the Processing Time of Inbound Mixed Bag Operations in Blue Dart's Airport Hub

Effectiveness of inbound logistics is the key to maintaining the overall efficiency and service excellence of express parcel delivery operations.This project at Blue Dart Express Limited is designed to streamline the inbound processing time of mixed bags at the airport hub.The goal is to spot process inefficiencies and make effective solutions to increase throughput without reducing quality or service level.The study analyzes the intrinsic activities involved within the mixed bag inbound process-acknowledgment, segregation, sorting, linking, and networking-and recognizes areas of critical time-consuming bottlenecks.Spotting areas calling for intervention with data analysis, process mapping, and interviews involving stakeholders were among the results shown.The project suggests implementable solutions like improved resource allocation, rearrangement of layout, and embracing lean practices to minimize delays and enhance coordination between departments.Anticipated outcomes are improved processing speed, improved space utilization, and overall higher productivity of the inbound logistics business.These changes will lead to improved customer satisfaction and further establish Blue Dart as a market leader in express logistics. I.

Publication Details

Journal
IARJSET
Published
2025-05-10
DOI
https://doi.org/10.17148/iarjset.2025.125241
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A study on Improving the Processing Time of Inbound Mixed Bag Operations in Blue Dart's Airport Hub

IARJSET
Advanced Manufacturing and Logistics Optimization
article

A study on Improving the Processing Time of Inbound Mixed Bag Operations in Blue Dart's Airport Hub

article en

Abstract

Effectiveness of inbound logistics is the key to maintaining the overall efficiency and service excellence of express parcel delivery operations.This project at Blue Dart Express Limited is designed to streamline the inbound processing time of mixed bags at the airport hub.The goal is to spot process inefficiencies and make effective solutions to increase throughput without reducing quality or service level.The study analyzes the intrinsic activities involved within the mixed bag inbound process-acknowledgment, segregation, sorting, linking, and networking-and recognizes areas of critical time-consuming bottlenecks.Spotting areas calling for intervention with data analysis, process mapping, and interviews involving stakeholders were among the results shown.The project suggests implementable solutions like improved resource allocation, rearrangement of layout, and embracing lean practices to minimize delays and enhance coordination between departments.Anticipated outcomes are improved processing speed, improved space utilization, and overall higher productivity of the inbound logistics business.These changes will lead to improved customer satisfaction and further establish Blue Dart as a market leader in express logistics. I.

IARJSETVol. 12(5)
Openalex Percentile: Top 86%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.