Increasing Production Target Thorough Major Maintenance

Suboptimal production equipment conditions hinder optimal production activities, necessitating maintenance to maintain production performance. RU VI Balongan has decided to renew several important units to not only improve production capability but also to increase it, enabling the achievement of production targets to meet demand. The Major Turn Around project conducted in 2022 focused on this aspect, where revamping activities were carried out on two main processing units, namely the Crude Distillation Unit (CDU), and the Residue Catalytic Cracking (RCC) unit was replaced. This Turn Around project is also one of the efforts to achieve the RDMP (Refinery Development Master Plan) as one of the National Strategic Projects (PSN), where RU VI aims to increase the total production capacity from 125,000 barrels/day to 150,000 barrels/day. PT Pertamina International Refinery RU VI Balongan is one of the 6 processing units owned by PT Pertamina (Persero) engaged in the production of fuels, non-fuels, and petrochemicals.

Authors

Institutions

Publication Details

Journal
International Journal of Business and Quality Research
Published
2024-12-01
DOI
https://doi.org/10.63922/ijbqr.v2i04.1113
Primary Topic
Agricultural Productivity and Crop Improvement
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Increasing Production Target Thorough Major Maintenance

Muhammad Rifqi Aurynnanda Adinugraha
1 links
International Journal of Business and Quality Research
Agricultural Productivity and Crop Improvement
article

Increasing Production Target Thorough Major Maintenance

Muhammad Rifqi Aurynnanda Adinugraha
article en

Abstract

Suboptimal production equipment conditions hinder optimal production activities, necessitating maintenance to maintain production performance. RU VI Balongan has decided to renew several important units to not only improve production capability but also to increase it, enabling the achievement of production targets to meet demand. The Major Turn Around project conducted in 2022 focused on this aspect, where revamping activities were carried out on two main processing units, namely the Crude Distillation Unit (CDU), and the Residue Catalytic Cracking (RCC) unit was replaced. This Turn Around project is also one of the efforts to achieve the RDMP (Refinery Development Master Plan) as one of the National Strategic Projects (PSN), where RU VI aims to increase the total production capacity from 125,000 barrels/day to 150,000 barrels/day. PT Pertamina International Refinery RU VI Balongan is one of the 6 processing units owned by PT Pertamina (Persero) engaged in the production of fuels, non-fuels, and petrochemicals.

International Journal of Business and Quality ResearchVol. 2(04)
Islamic University of Indonesia (ID)
Openalex Percentile: Top 59%
Agricultural Productivity and Crop Improvement
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Increasing Production Target Thorough Major Maintenance — Muhammad Rifqi Aurynnanda Adinugraha · International Journal of Business and Quality Research (2024) | TGRS Research Map | TGRS