RISK ANALYSIS ON THE IMPLEMENTATION OF THE CONSTRUCTION PROJECT OF THE HIGH PROSECUTOR'S OFFICE OF SOUTH KALIMANTAN PROVINCE (CONTINUED)

The change in the status of the capital city of South Kalimantan province has implications for the development of urban infrastructure. Various construction works are being carried out, such as the construction of buildings, roads, and bridges. In the implementation of a construction project, of course, there is never a risk that can hinder the implementation process wherever the project is carried out. For example, the South Kalimantan Provincial High Prosecutor's Office (Continued) project is one of the medium-risk projects.The method used for this risk analysis is to use a quantitative research method with validity and reliability tests. Then analyze the Probability and Impact data using the Severity Index calculation, which further determines the level of risk with the Matrix Probability and Impact. Then categorize these risk variables into risk acceptance scales in order to obtain the dominant risk variables that occur in the project.The results of the research from the risk analysis on the Implementation of the South Kalimantan Provincial High Prosecutor's Office Development Project (Continued) obtained 15 valid risk variables. There were 11 dominant risk variables with medium categories and 3 risks with high categories that affected the projectKeywords: Risk, Risk Analysis, Building, Severity Index

Authors

Publication Details

Journal
CERUCUK
Published
2025-04-17
DOI
https://doi.org/10.20527/crc.v9i2.14839
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RISK ANALYSIS ON THE IMPLEMENTATION OF THE CONSTRUCTION PROJECT OF THE HIGH PROSECUTOR'S OFFICE OF SOUTH KALIMANTAN PROVINCE (CONTINUED)

Irwina Sari Verdiyani, Abdul Karim
CERUCUK
Occupational Health and Safety Management
article

RISK ANALYSIS ON THE IMPLEMENTATION OF THE CONSTRUCTION PROJECT OF THE HIGH PROSECUTOR'S OFFICE OF SOUTH KALIMANTAN PROVINCE (CONTINUED)

Irwina Sari Verdiyani, Abdul Karim
article en

Abstract

The change in the status of the capital city of South Kalimantan province has implications for the development of urban infrastructure. Various construction works are being carried out, such as the construction of buildings, roads, and bridges. In the implementation of a construction project, of course, there is never a risk that can hinder the implementation process wherever the project is carried out. For example, the South Kalimantan Provincial High Prosecutor's Office (Continued) project is one of the medium-risk projects.The method used for this risk analysis is to use a quantitative research method with validity and reliability tests. Then analyze the Probability and Impact data using the Severity Index calculation, which further determines the level of risk with the Matrix Probability and Impact. Then categorize these risk variables into risk acceptance scales in order to obtain the dominant risk variables that occur in the project.The results of the research from the risk analysis on the Implementation of the South Kalimantan Provincial High Prosecutor's Office Development Project (Continued) obtained 15 valid risk variables. There were 11 dominant risk variables with medium categories and 3 risks with high categories that affected the projectKeywords: Risk, Risk Analysis, Building, Severity Index

CERUCUKVol. 9(2)
Openalex Percentile: Top 84%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.