EVALUATION OF CONCRETE CONSTRUCTION COLLAPSE ON THE MARTAPURA RIVERBANK AND SAFE DESIGN

The footbridge in Gang Gusti Galuh is a construction built for the needs of local pedestrian traffic, over time the footbridge collapsed. The collapse of the Concrete Footbridge Construction in Gang Gusti Galuh in early 2024 between January-February has added to the series of concrete construction failures in Indonesia, especially in South Kalimantan.The collapse of this bridge was due to inadequate foundation support and the influence of inhomogeneous soil. The purpose of this design is to determine the cause of the collapse and analyze what forces occur in the construction and its new design that is safe to use. The results of this evaluation indicate that the existing condition of the bridge with a wooden foundation is not safe to use and will be replaced with a new foundation using concrete piles to be more adequate and safe to use. Keywords: Construction, Footbridge, Redesign

Authors

Publication Details

Journal
CERUCUK
Published
2025-04-17
DOI
https://doi.org/10.20527/crc.v9i4.15018
Primary Topic
Construction Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EVALUATION OF CONCRETE CONSTRUCTION COLLAPSE ON THE MARTAPURA RIVERBANK AND SAFE DESIGN

Rusdiansyah Rusdiansyah, Nadia Afiqah Rindhani
CERUCUK
Construction Engineering and Safety
article

EVALUATION OF CONCRETE CONSTRUCTION COLLAPSE ON THE MARTAPURA RIVERBANK AND SAFE DESIGN

Rusdiansyah Rusdiansyah, Nadia Afiqah Rindhani
article en

Abstract

The footbridge in Gang Gusti Galuh is a construction built for the needs of local pedestrian traffic, over time the footbridge collapsed. The collapse of the Concrete Footbridge Construction in Gang Gusti Galuh in early 2024 between January-February has added to the series of concrete construction failures in Indonesia, especially in South Kalimantan.The collapse of this bridge was due to inadequate foundation support and the influence of inhomogeneous soil. The purpose of this design is to determine the cause of the collapse and analyze what forces occur in the construction and its new design that is safe to use. The results of this evaluation indicate that the existing condition of the bridge with a wooden foundation is not safe to use and will be replaced with a new foundation using concrete piles to be more adequate and safe to use. Keywords: Construction, Footbridge, Redesign

CERUCUKVol. 9(4)
Openalex Percentile: Top 89%
Construction Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.