Exploratory Results of Building-Integrated Small Hydro Pumped Storage (SHPS) Systems

Waterpower, a form of renewable energy, has been used for irrigation since a thousand years ago with the construction of water turbines or mills. This project addresses energy management challenges in urban buildings by creating a small-scale hydro-pumped storage system using Pelton turbines. It consists of two phases: the initial conceptual stage and the subsequent implementation and analysis stage. In the first phase, thorough research defines the problem and gathers relevant data. Solidworks software is used to meticulously design system components, considering factors like water flow rates and head height. The second phase involves the preliminary result of the system and rigorous on-site testing to measure Pelton turbine performance metrics, including power output, torque, and water flow velocity. A comprehensive feasibility study evaluates the system's impact within a building context. Expected outcomes include a holistic system design, turbine selection, and seamless integration within the building infrastructure.

Authors

Institutions

Publication Details

Journal
Semarak International Journal of Civil and Structural Engineering
Published
2025-05-07
DOI
https://doi.org/10.37934/sijcse.1.1.1629a
Citations
1
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploratory Results of Building-Integrated Small Hydro Pumped Storage (SHPS) Systems

Kamarul Ariffin Khalid, Baseemah Mat Jalaluddin, Nur Irwany Ahmad, Mohd. Luqman Mohd Fairudzi
1 citations
Semarak International Journal of Civil and Structural Engineering
Smart Grid Energy Management
0.73
article

Exploratory Results of Building-Integrated Small Hydro Pumped Storage (SHPS) Systems

Kamarul Ariffin Khalid, Baseemah Mat Jalaluddin, Nur Irwany Ahmad, Mohd. Luqman Mohd Fairudzi
article en
1 citations

Abstract

Waterpower, a form of renewable energy, has been used for irrigation since a thousand years ago with the construction of water turbines or mills. This project addresses energy management challenges in urban buildings by creating a small-scale hydro-pumped storage system using Pelton turbines. It consists of two phases: the initial conceptual stage and the subsequent implementation and analysis stage. In the first phase, thorough research defines the problem and gathers relevant data. Solidworks software is used to meticulously design system components, considering factors like water flow rates and head height. The second phase involves the preliminary result of the system and rigorous on-site testing to measure Pelton turbine performance metrics, including power output, torque, and water flow velocity. A comprehensive feasibility study evaluates the system's impact within a building context. Expected outcomes include a holistic system design, turbine selection, and seamless integration within the building infrastructure.

Semarak International Journal of Civil and Structural EngineeringVol. 1(1)
Universiti Malaysia Perlis (MY)
Openalex Percentile: Top 28%
Smart Grid Energy Management
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.