Adjustable Robust Optimization for Integrated Power and Water Systems under Uncertainty

Water distribution systems (WDS) and power distribution systems (PDS) are strongly connected and mutually affect each other. Recently, several studies suggested accounting for this dependency to enhance the overall efficiency of the two critical systems. However, in these studies, the uncertainty inherent in the two systems got less attention. Here, we emphasize the uncertainty modeling by using robust optimization (RO) and adjustable robust optimization (ARO) to co-optimize the day-ahead scheduling of an integrated PDS–WDS. In this problem, we consider the uncertainty in both power loads and water demands and its impact on the operational strategies of the coupled system. Using RO and ARO, we can derive the Pareto frontier between operation cost and system reliability. Our results suggest that for high levels of reliability, the ARO outperforms the RO approach, as it can achieve a high level of reliability with lower operation costs.

Authors

Institutions

Publication Details

Published
2025-05-15
DOI
https://doi.org/10.1061/9780784486184.090
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Adjustable Robust Optimization for Integrated Power and Water Systems under Uncertainty

Gal Perelman, Mashor Housh, Avi Ostfeld, Aviad Navon
Water resources management and optimization
article

Adjustable Robust Optimization for Integrated Power and Water Systems under Uncertainty

Gal Perelman, Mashor Housh, Avi Ostfeld, Aviad Navon
article en

Abstract

Water distribution systems (WDS) and power distribution systems (PDS) are strongly connected and mutually affect each other. Recently, several studies suggested accounting for this dependency to enhance the overall efficiency of the two critical systems. However, in these studies, the uncertainty inherent in the two systems got less attention. Here, we emphasize the uncertainty modeling by using robust optimization (RO) and adjustable robust optimization (ARO) to co-optimize the day-ahead scheduling of an integrated PDS–WDS. In this problem, we consider the uncertainty in both power loads and water demands and its impact on the operational strategies of the coupled system. Using RO and ARO, we can derive the Pareto frontier between operation cost and system reliability. Our results suggest that for high levels of reliability, the ARO outperforms the RO approach, as it can achieve a high level of reliability with lower operation costs.

Technion – Israel Institute of Technology (IL), University of Michigan (US), University of Haifa (IL)
Affordable and clean energy
Openalex Percentile: Top 87%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Adjustable Robust Optimization for Integrated Power and Water Systems under Uncertainty — Gal Perelman, Mashor Housh, et al. · (2025) | TGRS Research Map | TGRS