Optimizing Container Ship Stowage Planning with Yard Clash Considerations: Enhancing Yard and Quay Crane Coordination

Container ship stowage planning is a critical task that impacts the operational efficiency of both shipping companies and container terminals. This study addresses the often-overlooked issue of yard clashes, which are caused by the performance disparity between yard and quay cranes, hindering container retrieval and loading efficiency. We present the yard clash-aware stowage planning problem that integrates stowage planning and crane scheduling to minimize idle times of quay cranes. A mixed integer programming model, a just-in-time heuristic, and a genetic algorithm are developed to solve this complex problem. Numerical experiments demonstrate that while the mixed integer programming model struggles with large-scale instances, the just-in-time heuristic and genetic algorithm deliver competitive solutions with significantly reduced computation times. These findings highlight the potential of heuristic and metaheuristic approaches in addressing real-world operational challenges in maritime logistics.

Authors

Institutions

Publication Details

Published
2025-02-28
DOI
https://doi.org/10.1109/iccece65250.2025.10985221
Primary Topic
Maritime Ports and Logistics
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Container Ship Stowage Planning with Yard Clash Considerations: Enhancing Yard and Quay Crane Coordination

Bo Jin, Tony W. Tong
Maritime Ports and Logistics
article

Optimizing Container Ship Stowage Planning with Yard Clash Considerations: Enhancing Yard and Quay Crane Coordination

Bo Jin, Tony W. Tong
article en

Abstract

Container ship stowage planning is a critical task that impacts the operational efficiency of both shipping companies and container terminals. This study addresses the often-overlooked issue of yard clashes, which are caused by the performance disparity between yard and quay cranes, hindering container retrieval and loading efficiency. We present the yard clash-aware stowage planning problem that integrates stowage planning and crane scheduling to minimize idle times of quay cranes. A mixed integer programming model, a just-in-time heuristic, and a genetic algorithm are developed to solve this complex problem. Numerical experiments demonstrate that while the mixed integer programming model struggles with large-scale instances, the just-in-time heuristic and genetic algorithm deliver competitive solutions with significantly reduced computation times. These findings highlight the potential of heuristic and metaheuristic approaches in addressing real-world operational challenges in maritime logistics.

Shenzhen University (CN)
National Natural Science Foundation of China
Clean water and sanitation
Openalex Percentile: Top 86%
Maritime Ports and Logistics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.