The installation of electromechanical equipment is the key to hydropower station construction. The installation of electromechanical equipment in hydropower station is difficult and requires high precision; the installation process involves many professional fields and multi-party personnel, the business process is complicated and cumbersome, and the construction schedule and quality control are difficult; the whole life management period of equipment circulation is long, the task is heavy and the cost is high. So, this paper proposes for the first time an intelligent control scheme for electromechanical construction of hydropower station, which runs building information modeling (BIM) technology through the whole life cycle of the project and creates a new management and control mode for project construction.

Authors

Institutions

Publication Details

Published
2024-11-29
DOI
https://doi.org/10.1109/ei264398.2024.10991711
Primary Topic
Advanced Computational Techniques and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Electromechanical Intelligent Construction of Multi-fusion Hydropower Station Based on BIM Technology

Yuhong Qin, Shuting Yu, Renbo Tang, Xiang Wu et al.
Advanced Computational Techniques and Applications
article

Research on Electromechanical Intelligent Construction of Multi-fusion Hydropower Station Based on BIM Technology

Yuhong Qin, Shuting Yu, Renbo Tang, Xiang Wu, Zhibo Jiang, Yun Luo
article en

Abstract

The installation of electromechanical equipment is the key to hydropower station construction. The installation of electromechanical equipment in hydropower station is difficult and requires high precision; the installation process involves many professional fields and multi-party personnel, the business process is complicated and cumbersome, and the construction schedule and quality control are difficult; the whole life management period of equipment circulation is long, the task is heavy and the cost is high. So, this paper proposes for the first time an intelligent control scheme for electromechanical construction of hydropower station, which runs building information modeling (BIM) technology through the whole life cycle of the project and creates a new management and control mode for project construction.

PowerChina (China) (CN), Powerchina Huadong Engineering Corporation (China) (CN)
Openalex Percentile: Top 73%
Advanced Computational Techniques and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.