Annual Time-Series Operation Simulation and Rapid Solution Method for Power Systems

As the proportion of renewable energy increases in the new-type power system, the significance of conducting annual time-series operational simulations for renewable energy gradually emerges. The existing panoramic time-series operational simulations for power systems fail to achieve supply-demand balance over a long time scale, and the solution methods cannot balance both speed and accuracy. To address these issues, we first established an annual time-series-coupled unit commitment (UC) model to conduct hourly operational simulations for all 8760 hours of the year. Subsequently, we selected the optimal number of clusters for the time series in the model on a monthly basis, conducted clustering based on these selections, and reconstructed the time series to reduce its dimensionality. By solving the simplified time series, we achieved rapid solution of the model. Finally, we compared the proposed method with some existing methods, demonstrating that our method maintains high accuracy while greatly improving the solving speed.

Authors

Institutions

Publication Details

Published
2024-11-29
DOI
https://doi.org/10.1109/ei264398.2024.10991685
Citations
1
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.17

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Annual Time-Series Operation Simulation and Rapid Solution Method for Power Systems

Zhiqiang Lu, Chen Wang, Cuntai Zhang, Wenzhe Chen
1 citations
Power Systems and Renewable Energy
0.17
article

Annual Time-Series Operation Simulation and Rapid Solution Method for Power Systems

Zhiqiang Lu, Chen Wang, Cuntai Zhang, Wenzhe Chen
article en
1 citations

Abstract

As the proportion of renewable energy increases in the new-type power system, the significance of conducting annual time-series operational simulations for renewable energy gradually emerges. The existing panoramic time-series operational simulations for power systems fail to achieve supply-demand balance over a long time scale, and the solution methods cannot balance both speed and accuracy. To address these issues, we first established an annual time-series-coupled unit commitment (UC) model to conduct hourly operational simulations for all 8760 hours of the year. Subsequently, we selected the optimal number of clusters for the time series in the model on a monthly basis, conducted clustering based on these selections, and reconstructed the time series to reduce its dimensionality. By solving the simplified time series, we achieved rapid solution of the model. Finally, we compared the proposed method with some existing methods, demonstrating that our method maintains high accuracy while greatly improving the solving speed.

State Grid Corporation of China (China) (CN), Huazhong University of Science and Technology (CN)
State Grid Corporation of China
Affordable and clean energy
Openalex Percentile: Top 38%
Power Systems and Renewable Energy
0.17
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.