Generation method of anti-misoperation locking logic rules for substations based on typical wiring
At present, substations usually use electrical blocking facilities to achieve the function of anti-fault blocking, but new stations and new reconstruction and expansion stations have the problem of low efficiency in the compilation and review of anti-fault blocking logic rules, and also need a lot of manual debugging and checking time. In this paper, based on the typical substation wiring and anti-false blocking logic rules, the typical substation wiring library and the corresponding blocking logic library are constructed; then, the graphic editing module and graphic analysis module are constructed by combining the substation modelling method with the topology and other technologies. Finally, the automatic generation of anti-error latching logic rules is realised, which solves the problems of low efficiency and lack of reliability in the writing and checking of the corresponding substation anti-misoperation locking logic rules.
Authors
- Rongrong Ji (ORCID: https://orcid.org/0000-0001-9163-2932)
- Hui Zou (ORCID: https://orcid.org/0000-0003-2637-3895)
- H.Q. Hou (ORCID: https://orcid.org/0009-0007-7936-9423)
- Xingxu Zhu
- Jing‐Xiang Zhang (ORCID: https://orcid.org/0000-0002-4068-6495)
- Junhui Li (ORCID: https://orcid.org/0000-0001-6344-6147)
- Cuiping Li
- K. K. Duan (ORCID: https://orcid.org/0000-0002-2233-5253)
Institutions
- North China Electric Power University (CN)
- Northeast Electric Power University (CN)
- Shanghai Electric (China) (CN)
Publication Details
- Published
- 2024-11-29
- DOI
- https://doi.org/10.1109/ei264398.2024.10990809
- Primary Topic
- Smart Grid and Power Systems
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- State Grid Corporation of China