Online SVR Neural Network Based Ultra High Voltage Transmission Early Warning of Construction Progress

Ultra high-voltage (UHV) transmission construction involves live work, requires crossing long distances, and must overcome terrain and climate challenges. Therefore, to enhance the accuracy of UHV transmission construction progress prediction and address the issue of online early warning, an early warning method for UHV transmission construction progress based on the online support vector regression (Online SVR) algorithm is proposed. Utilizing the digital twin model of UHV transmission construction, principal component analysis is employed to extract and analyze key factors influencing construction progress, the Online SVR algorithm dynamically learns and predicts construction progress. The prediction results are compared with the planned construction warning line to provide early warnings of potential construction progress risks. Finally, the method is applied to an actual UHV transmission construction site to verify its effectiveness.

Authors

Institutions

Publication Details

Published
2024-11-29
DOI
https://doi.org/10.1109/ei264398.2024.10991899
Primary Topic
Geoscience and Mining Technology
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Online SVR Neural Network Based Ultra High Voltage Transmission Early Warning of Construction Progress

Zhang YiQuan, Xingtang Wu, Mingyang Chen, Yuhan Xu et al.
Geoscience and Mining Technology
article

Online SVR Neural Network Based Ultra High Voltage Transmission Early Warning of Construction Progress

Zhang YiQuan, Xingtang Wu, Mingyang Chen, Yuhan Xu, Qian Yi, Liang Zhou, Yinjie Zhu, Fang Fang
article en

Abstract

Ultra high-voltage (UHV) transmission construction involves live work, requires crossing long distances, and must overcome terrain and climate challenges. Therefore, to enhance the accuracy of UHV transmission construction progress prediction and address the issue of online early warning, an early warning method for UHV transmission construction progress based on the online support vector regression (Online SVR) algorithm is proposed. Utilizing the digital twin model of UHV transmission construction, principal component analysis is employed to extract and analyze key factors influencing construction progress, the Online SVR algorithm dynamically learns and predicts construction progress. The prediction results are compared with the planned construction warning line to provide early warnings of potential construction progress risks. Finally, the method is applied to an actual UHV transmission construction site to verify its effectiveness.

North China Electric Power University (CN)
Science and Technology Project of State Grid
Openalex Percentile: Top 64%
Geoscience and Mining Technology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Online SVR Neural Network Based Ultra High Voltage Transmission Early Warning of Construction Progress — Zhang YiQuan, Xingtang Wu, et al. · (2024) | TGRS Research Map | TGRS