Linearization and Acceleration Strategy of Unit Commitment Model Incorporating Cascade Hydropower
This paper establishes a hydro-thermal unit commitment model incorporating cascaded hydropower stations. Due to the characteristics of high dimensionality and strong coupling between constraints, this paper adopts linearization methods for nonlinear objectives and constraints after considering the requirements of solving efficiency and calculation accuracy. It proposes corresponding Benders decomposition and heuristic solving methods, and solves the model using IEEE 118 and 300-bus systems.
Authors
- Zhi Cai (ORCID: https://orcid.org/0000-0001-6732-6855)
- Yuxuan Li (ORCID: https://orcid.org/0000-0002-4665-1816)
- Chengqi Zhang (ORCID: https://orcid.org/0000-0001-5715-7154)
- Qiang Ding (ORCID: https://orcid.org/0000-0001-5377-1173)
- Xiaojing Hu (ORCID: https://orcid.org/0000-0001-9863-0219)
Institutions
- North China Electric Power University (CN)
- China Electric Power Research Institute
Publication Details
- Published
- 2024-11-29
- DOI
- https://doi.org/10.1109/ei264398.2024.10990677
- Primary Topic
- Power Systems and Renewable Energy
- Type
- article
- Field-Weighted Citation Impact
- 0.00