The Impact of the Drainage Cabinet on DC Current Flowing into the Neutral Point of the Power Transformer

To study the impact of the drainage cabinet on the DC current flowing into the neutral point of the power transformer, a simulation model was built using CDEGS. The case study includes one 500kV substation, seven 220kV substations, and a subway system with a total length of 13.5 km and nine traction substations. The potential, primary stray current, and secondary stray current were compared before and after the commissioning of the drainage cabinet. Additionally, the effect of the train's position was analyzed. The results show that after the commissioning of the drainage cabinet, when the train reaches position 23, both the potentials of the grounding grid and the DC current at the substation decrease. The impact of the train's position varies across different substations. In most cases, the DC current decreases after the commissioning of the drainage cabinet.

Authors

Institutions

Publication Details

Published
2024-11-29
DOI
https://doi.org/10.1109/ei264398.2024.10991609
Primary Topic
Power Transformer Diagnostics and Insulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Impact of the Drainage Cabinet on DC Current Flowing into the Neutral Point of the Power Transformer

Chenglin Ye, Xiaoshuang Li, Zeyang Tang, Lei Wang et al.
Power Transformer Diagnostics and Insulation
article

The Impact of the Drainage Cabinet on DC Current Flowing into the Neutral Point of the Power Transformer

Chenglin Ye, Xiaoshuang Li, Zeyang Tang, Lei Wang, Gang Li, Tian Qin, Ling Ruan, Zhuang Ruan
article en

Abstract

To study the impact of the drainage cabinet on the DC current flowing into the neutral point of the power transformer, a simulation model was built using CDEGS. The case study includes one 500kV substation, seven 220kV substations, and a subway system with a total length of 13.5 km and nine traction substations. The potential, primary stray current, and secondary stray current were compared before and after the commissioning of the drainage cabinet. Additionally, the effect of the train's position was analyzed. The results show that after the commissioning of the drainage cabinet, when the train reaches position 23, both the potentials of the grounding grid and the DC current at the substation decrease. The impact of the train's position varies across different substations. In most cases, the DC current decreases after the commissioning of the drainage cabinet.

State Grid Corporation of China (China) (CN), Dongfang Electric Corporation (China) (CN)
Openalex Percentile: Top 72%
Power Transformer Diagnostics and Insulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.