On sizing of Battery Energy Storage Systems for independent multi-ancillary services in AC grids

Battery Energy Storage Systems (BESS) arise as a crucial technology to transition from conventional/centralized to decentralized/eletronized power systems. A multi-step BESS sizing procedure for independent multi-ancillary services is a highly demanded tool that supports prosumers’ and utilities’ decision-making to pursue attractive investments that meet the intended technical requirements. Thus, this paper proposes a novel multi-step methodology for BESS sizing, evaluating economic viability, utilizing real-world mission profiles, and estimating Li-ion battery bank degradation, based on three ancillary services: self-consumption (SC), energy time-shift (ETS), and islanded (IS) operation. The methodology is applied to four case studies in the SC and ETS modes, evaluating the effects of ( i ) photovoltaic (PV) power plant size, ( i i ) fixed PV capacity, ( i i i ) battery size trade-offs, and ( i v ) grid power charging. Results showed that the sized BESS performing ETS, charged by a 250 kW PV system, with a capital expenditure of $218,806, achieved a net present value of $417,739, an internal rate of return of 18.55%, and a discounted payback period of 9 years. The system maintains an average state of charge of 75%, with 6.4% of the time unable to provide ETS due to battery constraints. In islanded operation, the same system provided 10 h of autonomy during grid outages, which is sufficient to support the facility. It is also shown that sensitivity analysis in promising scenarios, such as energy tariff increases and BESS cost reductions, further enhances the technical and economic feasibility of the system. • Proposed multi-step BESS sizing procedure for independent multi-ancillary services. • BESS sized for ancillary services such as energy–time shift, islanded, and self-consumption modes. • Methodology employs real-field mission-profile data, ensuring its effectiveness in addressing real-world sizing challenges. • The lifetime of Li-ion batteries is assessed comparatively for several case studies, considering the damage caused by cycling and calendar aging mechanisms. • Techno-economic viability of BESS operating in energy–time shift mode is evaluated through economic metrics: net present value, internal rate of return, and discounted payback. • Although economically viable, discounted payback of 9 years and internal rate of return of 18.5% suggest that financial metrics are not as attractive as other investments (i.e., PV systems). Until a better technology maturation in the market, BESS investment cannot be motivated only by economics yet, being also justified by technical reasons.

Authors

Institutions

Publication Details

Journal
e-Prime - Advances in Electrical Engineering Electronics and Energy
Published
2025-05-15
DOI
https://doi.org/10.1016/j.prime.2025.101000
Citations
1
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
0.68
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

On sizing of Battery Energy Storage Systems for independent multi-ancillary services in AC grids

William Caires Silva Amorim, João Marcus S. Callegari, Braz J. Cardoso Filho, Danilo I. Brandão et al.
1 citations
e-Prime - Advances in Electrical Engineering Electronics and Energy
Advanced Battery Technologies Research
0.68
article

On sizing of Battery Energy Storage Systems for independent multi-ancillary services in AC grids

William Caires Silva Amorim, João Marcus S. Callegari, Braz J. Cardoso Filho, Danilo I. Brandão, Heverton Augusto Pereira
article en
1 citations

Abstract

Battery Energy Storage Systems (BESS) arise as a crucial technology to transition from conventional/centralized to decentralized/eletronized power systems. A multi-step BESS sizing procedure for independent multi-ancillary services is a highly demanded tool that supports prosumers’ and utilities’ decision-making to pursue attractive investments that meet the intended technical requirements. Thus, this paper proposes a novel multi-step methodology for BESS sizing, evaluating economic viability, utilizing real-world mission profiles, and estimating Li-ion battery bank degradation, based on three ancillary services: self-consumption (SC), energy time-shift (ETS), and islanded (IS) operation. The methodology is applied to four case studies in the SC and ETS modes, evaluating the effects of ( i ) photovoltaic (PV) power plant size, ( i i ) fixed PV capacity, ( i i i ) battery size trade-offs, and ( i v ) grid power charging. Results showed that the sized BESS performing ETS, charged by a 250 kW PV system, with a capital expenditure of $218,806, achieved a net present value of $417,739, an internal rate of return of 18.55%, and a discounted payback period of 9 years. The system maintains an average state of charge of 75%, with 6.4% of the time unable to provide ETS due to battery constraints. In islanded operation, the same system provided 10 h of autonomy during grid outages, which is sufficient to support the facility. It is also shown that sensitivity analysis in promising scenarios, such as energy tariff increases and BESS cost reductions, further enhances the technical and economic feasibility of the system. • Proposed multi-step BESS sizing procedure for independent multi-ancillary services. • BESS sized for ancillary services such as energy–time shift, islanded, and self-consumption modes. • Methodology employs real-field mission-profile data, ensuring its effectiveness in addressing real-world sizing challenges. • The lifetime of Li-ion batteries is assessed comparatively for several case studies, considering the damage caused by cycling and calendar aging mechanisms. • Techno-economic viability of BESS operating in energy–time shift mode is evaluated through economic metrics: net present value, internal rate of return, and discounted payback. • Although economically viable, discounted payback of 9 years and internal rate of return of 18.5% suggest that financial metrics are not as attractive as other investments (i.e., PV systems). Until a better technology maturation in the market, BESS investment cannot be motivated only by economics yet, being also justified by technical reasons.

e-Prime - Advances in Electrical Engineering Electronics and EnergyVol. 12
Universidade Federal de Minas Gerais (BR), Universidade Federal de Viçosa (BR)
Affordable and clean energy
Openalex Percentile: Top 31%
Advanced Battery Technologies Research
0.68
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.