Analysis of Priority Improvement in Draft Quality of Sizing Using Grey Theory in FMEA

Draft quality is a crucial problem in the sizing section. There were 3889 warp yarn breaks for six months. The study aims to decrease quality draft defects by applying the grey theory in the traditional FMEA. After analyzing the flow process, 41 potential causes (PC) were found from 12 potential failure modes in 7 areas. There is no significant difference in the top 5 rankings of the RPN assessment on traditional FMEA and grey theory. However, there is a slight difference in ranking on 5 PC. The first priority (RPN= 48; GR=0.588) is in the beam shaft with the creel unaligned in the beam installation (pneumatic piston not parallel). The last priority (RPN= 4; GR=0.857) is a less oiling. This research can recommend an improvement sizing process based on the proposed repairs or maintenance list, using the Grey theory in the FMEA method to decrease the weaving industry defect rate.

Authors

Publication Details

Journal
IJIEM - Indonesian Journal of Industrial Engineering and Management
Published
2025-05-10
DOI
https://doi.org/10.22441/ijiem.v6i1.29858
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Priority Improvement in Draft Quality of Sizing Using Grey Theory in FMEA

Hendri Pujianto, Mohadi Mohadi, Dana Nasihardani, Yunus Nazar et al.
IJIEM - Indonesian Journal of Industrial Engineering and Management
Manufacturing Process and Optimization
article

Analysis of Priority Improvement in Draft Quality of Sizing Using Grey Theory in FMEA

Hendri Pujianto, Mohadi Mohadi, Dana Nasihardani, Yunus Nazar, Dora Virma Yolanda Gultom
article en

Abstract

Draft quality is a crucial problem in the sizing section. There were 3889 warp yarn breaks for six months. The study aims to decrease quality draft defects by applying the grey theory in the traditional FMEA. After analyzing the flow process, 41 potential causes (PC) were found from 12 potential failure modes in 7 areas. There is no significant difference in the top 5 rankings of the RPN assessment on traditional FMEA and grey theory. However, there is a slight difference in ranking on 5 PC. The first priority (RPN= 48; GR=0.588) is in the beam shaft with the creel unaligned in the beam installation (pneumatic piston not parallel). The last priority (RPN= 4; GR=0.857) is a less oiling. This research can recommend an improvement sizing process based on the proposed repairs or maintenance list, using the Grey theory in the FMEA method to decrease the weaving industry defect rate.

IJIEM - Indonesian Journal of Industrial Engineering and ManagementVol. 6(1)
Openalex Percentile: Top 86%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Priority Improvement in Draft Quality of Sizing Using Grey Theory in FMEA — Hendri Pujianto, Mohadi Mohadi, et al. · IJIEM - Indonesian Journal of Industrial Engineering and Management (2025) | TGRS Research Map | TGRS