Aplikasi Aljabar Max-Plus dan Petri Net dalam Penentuan Waktu Optimal Produksi Tempe di Pabrik Tempe Asli Hb Samarinda

Production time efficiency plays an important role in the food industry, including at the Tempe Asli HB Samarinda factory. The tempeh production process involves several lengthy stages, such as the preparation of raw materials, fermentation, and acidification. To optimize scheduling, Max-Plus algebra can be applied to enhance the effective and efficient use of production time. This study aims to construct a model of the tempeh production system using Petri Nets and to solve the tempeh production time problem by optimizing production time using Max-Plus Algebra. The research data was obtained through interviews with the branch manager of the Tempe Asli HB Samarinda factory. Petri nets were used to construct a coverability tree, which was subsequently transformed into a Max-Plus Algebra model. Subsequently, a model simulation was performed using production time data starting at t. The results of this research indicate that the optimal or minimum production time for tempeh is 3 days 6 hours and 57 minutes after production begins.

Authors

Institutions

Publication Details

Journal
Journal of Mathematics Education and Science
Published
2025-05-14
DOI
https://doi.org/10.32665/james.v8i1.4170
Citations
1
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
2.23

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Aplikasi Aljabar Max-Plus dan Petri Net dalam Penentuan Waktu Optimal Produksi Tempe di Pabrik Tempe Asli Hb Samarinda

Hardina Sandariria, Qonita Qurrota A’yun, Isna Nadia Khairina
1 citations
Journal of Mathematics Education and Science
Management and Optimization Techniques
2.23
article

Aplikasi Aljabar Max-Plus dan Petri Net dalam Penentuan Waktu Optimal Produksi Tempe di Pabrik Tempe Asli Hb Samarinda

Hardina Sandariria, Qonita Qurrota A’yun, Isna Nadia Khairina
article en
1 citations

Abstract

Production time efficiency plays an important role in the food industry, including at the Tempe Asli HB Samarinda factory. The tempeh production process involves several lengthy stages, such as the preparation of raw materials, fermentation, and acidification. To optimize scheduling, Max-Plus algebra can be applied to enhance the effective and efficient use of production time. This study aims to construct a model of the tempeh production system using Petri Nets and to solve the tempeh production time problem by optimizing production time using Max-Plus Algebra. The research data was obtained through interviews with the branch manager of the Tempe Asli HB Samarinda factory. Petri nets were used to construct a coverability tree, which was subsequently transformed into a Max-Plus Algebra model. Subsequently, a model simulation was performed using production time data starting at t. The results of this research indicate that the optimal or minimum production time for tempeh is 3 days 6 hours and 57 minutes after production begins.

Journal of Mathematics Education and ScienceVol. 8(1)
Mulawarman University (ID)
Fakultas Matematika dan Ilmu Pengetahuan Alam, Universitas Brawijaya
Openalex Percentile: Top 12%
Management and Optimization Techniques
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.