Simulation Method for Complex Constraints and the Necessity of Joints in an Early-Age, Large-Volume Concrete Slab—A Case Study of Complex Column Grids and Wall Constraints

In modern engineering and construction, mass concrete structures impose stringent requirements on crack control. However, there exists a conflict between design and construction: design primarily addresses the structural performance needs during service phases, while construction must confront the challenges of early-stage performance. It is, therefore, essential to investigate the complex constraints affecting mass concrete structures during their early stages. In this paper, a spring foundation was employed to simulate the intricate constraints on mass concrete footings at early ages, with parametric analyses systematically exploring the influence of spring constant values. The study reveals that excessively large spring constants overestimate constraint effects, leading to amplified stress calculations, while overly small constants underestimate actual constraints, resulting in diminished computed stresses. Building on these findings, this work establishes a quantitative relationship between spring constants and stress responses. Notably, a spring constant table incorporating various constraint scenarios was compiled to provide engineering recommendations. The goal was to reconcile the conflict between early-age and in-service performance through precise constraint modeling, offering theoretical foundations for selecting rational constraint parameters. This approach resolves critical issues in bottom slab design optimization and construction control, particularly addressing abnormal stress distributions and crack control challenges stemming from complex constraints.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-05-14
DOI
https://doi.org/10.3390/buildings15101647
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation Method for Complex Constraints and the Necessity of Joints in an Early-Age, Large-Volume Concrete Slab—A Case Study of Complex Column Grids and Wall Constraints

Wei Jiang, Hao Zhang, Zhiyi Li, Chen Fu et al.
1 citations
Buildings
BIM and Construction Integration
1.01
article

Simulation Method for Complex Constraints and the Necessity of Joints in an Early-Age, Large-Volume Concrete Slab—A Case Study of Complex Column Grids and Wall Constraints

Wei Jiang, Hao Zhang, Zhiyi Li, Chen Fu, Wenqian Li
article en
1 citations

Abstract

In modern engineering and construction, mass concrete structures impose stringent requirements on crack control. However, there exists a conflict between design and construction: design primarily addresses the structural performance needs during service phases, while construction must confront the challenges of early-stage performance. It is, therefore, essential to investigate the complex constraints affecting mass concrete structures during their early stages. In this paper, a spring foundation was employed to simulate the intricate constraints on mass concrete footings at early ages, with parametric analyses systematically exploring the influence of spring constant values. The study reveals that excessively large spring constants overestimate constraint effects, leading to amplified stress calculations, while overly small constants underestimate actual constraints, resulting in diminished computed stresses. Building on these findings, this work establishes a quantitative relationship between spring constants and stress responses. Notably, a spring constant table incorporating various constraint scenarios was compiled to provide engineering recommendations. The goal was to reconcile the conflict between early-age and in-service performance through precise constraint modeling, offering theoretical foundations for selecting rational constraint parameters. This approach resolves critical issues in bottom slab design optimization and construction control, particularly addressing abnormal stress distributions and crack control challenges stemming from complex constraints.

BuildingsVol. 15(10)
Tongji University (CN), Shanghai Urban Construction Design and Research Institute (Group) (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 25%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics