Identifying contractor selection criteria in Egyptian construction tenders: a SNA and PLS-SEM approach

Purpose Selecting the construction contractor is one of the most difficult decisions in the construction industry. This decision is not simple and is a multi-criteria decision that requires much concentration and effort. Thus, the purpose of this paper is to identify the important criteria for contractor selection (CS) and ensure the adaptation of these criteria to the Egyptian context. Design/methodology/approach A pilot study was used to validate the present listing of CS criteria, which was produced after a thorough literature investigation. Then, social network analysis (SNA) was used to pick the most important criterion. A Python programming technique was used to compute all of the matrices. Next, Smart PLS software was used to assess and validate the impact of identified selection criteria, ensuring a robust and systematic evaluation framework. Finally, using a questionnaire poll, 84 professionals in the Egyptian construction industry further validate the model’s output. Findings This study revealed that there are 60 criteria investigated as the most important criteria, categorized into technical; financial; resources; health and safety; management; experience; past performance; and bid. Additionally, partial least squares structural equation modeling (PLS-SEM) analysis showed that those criteria had a strong beneficial impact on CS in Egypt. Originality/value Although conducted in Egypt, this study’s findings align with regional practices, offering valuable insights for construction professionals across the Middle East. It aims to help construction managers enhance CS in Egypt.

Authors

Publication Details

Journal
Construction Innovation
Published
2025-04-04
DOI
https://doi.org/10.1108/ci-09-2024-0280
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identifying contractor selection criteria in Egyptian construction tenders: a SNA and PLS-SEM approach

Haytham Sanad, Tamer M. El Korany, A. A. Fouad
1 citations
Construction Innovation
Construction Project Management and Performance
2.11
article

Identifying contractor selection criteria in Egyptian construction tenders: a SNA and PLS-SEM approach

Haytham Sanad, Tamer M. El Korany, A. A. Fouad
article en
1 citations

Abstract

Purpose Selecting the construction contractor is one of the most difficult decisions in the construction industry. This decision is not simple and is a multi-criteria decision that requires much concentration and effort. Thus, the purpose of this paper is to identify the important criteria for contractor selection (CS) and ensure the adaptation of these criteria to the Egyptian context. Design/methodology/approach A pilot study was used to validate the present listing of CS criteria, which was produced after a thorough literature investigation. Then, social network analysis (SNA) was used to pick the most important criterion. A Python programming technique was used to compute all of the matrices. Next, Smart PLS software was used to assess and validate the impact of identified selection criteria, ensuring a robust and systematic evaluation framework. Finally, using a questionnaire poll, 84 professionals in the Egyptian construction industry further validate the model’s output. Findings This study revealed that there are 60 criteria investigated as the most important criteria, categorized into technical; financial; resources; health and safety; management; experience; past performance; and bid. Additionally, partial least squares structural equation modeling (PLS-SEM) analysis showed that those criteria had a strong beneficial impact on CS in Egypt. Originality/value Although conducted in Egypt, this study’s findings align with regional practices, offering valuable insights for construction professionals across the Middle East. It aims to help construction managers enhance CS in Egypt.

Construction Innovation
Openalex Percentile: Top 14%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.