The Transmission Line of Solar Farm

Australia is one of the most sunny continents in the world. Given the stable policy environment, solar energy has great potential for power generation in Australia in the coming decades. Solar energy is a rapidly growing industry in Australia. The overall idea of this project is: under the premise that the voltage does not exceed the range and no overload, the best scheme with the lowest cost is designed. A total of 180 options are available from the material provided. The team first excluded the 9mm conductor based on whether the rated current was reached. With the help of network data and calculation, we excluded pattern1 of bundling. After that, our team conducted simulation and calculated costing of the remaining 108 schemes by MATLAB. Then we chose Tower A/Bundle2/Conductor2/Bus5 as final solution and gave the costing. After that, we calculated the ABCD parameters and conducted fault analysis and circuit security based on Power World and knowledge that we learned.

Authors

Institutions

Publication Details

Published
2025-03-17
DOI
https://doi.org/10.1109/eespe63401.2025.10986957
Primary Topic
Photovoltaic Systems and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Transmission Line of Solar Farm

Xianhui Sun, Yuhui Zhang, Qiming Song
Photovoltaic Systems and Sustainability
article

The Transmission Line of Solar Farm

Xianhui Sun, Yuhui Zhang, Qiming Song
article en

Abstract

Australia is one of the most sunny continents in the world. Given the stable policy environment, solar energy has great potential for power generation in Australia in the coming decades. Solar energy is a rapidly growing industry in Australia. The overall idea of this project is: under the premise that the voltage does not exceed the range and no overload, the best scheme with the lowest cost is designed. A total of 180 options are available from the material provided. The team first excluded the 9mm conductor based on whether the rated current was reached. With the help of network data and calculation, we excluded pattern1 of bundling. After that, our team conducted simulation and calculated costing of the remaining 108 schemes by MATLAB. Then we chose Tower A/Bundle2/Conductor2/Bus5 as final solution and gave the costing. After that, we calculated the ABCD parameters and conducted fault analysis and circuit security based on Power World and knowledge that we learned.

Shandong University of Science and Technology (CN)
Affordable and clean energy
Openalex Percentile: Top 91%
Photovoltaic Systems and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.