This paper presents a study on the impact of commissioning a Static VAR Compensator (SVC) at the electrical substation in Loma Plata, a city in the Chaco region of Paraguay. The study examines the electrical characteristics of the station and the localities it serves. The research analyzes steady-state and transient conditions after commissioning the SVC, showing improved load margin at the substation bus and a rapid compensator response to contingency events.