Pengaruh Ekonomi Durasi Proyek Produksi Karpet Dengan Metode CPM di CV Natural Palembang

CV Natural Palembang is one of the local trading companies and exports of carpets and other furniture. The Production Department has a sub-division, namely the manufacture of carpets made from abaca tree fiber which is currently a mainstay product. For sales, especially exports that have a delivery deadline agreement so that delays must be avoided. Currently, production is experiencing some delays because production scheduling is still done manually with estimated time. These delays impact financial performance— the more delays occur, the higher the penalties, resulting in economic losses. The study was conducted by collecting data on the duration of each production process activity and calculating using the CPM (Critical Path Method) method and then analyzing the critical path and activities and optimum time. Based on the CPM calculation, the critical path is obtained, namely the 2nd activity path with the series AàCàDàEàGàHàIàJàK. The calculation results show that the total optimal time obtained is 19.5 hours, in other words 4.5 hours faster than the company's actual production time, which is 24 hours for 1 carpet. This time optimization leads to cost savings of IDR 3,920,000.

Authors

Publication Details

Journal
MDP Student Conference
Published
2025-04-26
DOI
https://doi.org/10.35957/mdp-sc.v4i2.11271
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pengaruh Ekonomi Durasi Proyek Produksi Karpet Dengan Metode CPM di CV Natural Palembang

Brigita Maria Juliska, Achmad Alfian
MDP Student Conference
Management and Optimization Techniques
article

Pengaruh Ekonomi Durasi Proyek Produksi Karpet Dengan Metode CPM di CV Natural Palembang

Brigita Maria Juliska, Achmad Alfian
article en

Abstract

CV Natural Palembang is one of the local trading companies and exports of carpets and other furniture. The Production Department has a sub-division, namely the manufacture of carpets made from abaca tree fiber which is currently a mainstay product. For sales, especially exports that have a delivery deadline agreement so that delays must be avoided. Currently, production is experiencing some delays because production scheduling is still done manually with estimated time. These delays impact financial performance— the more delays occur, the higher the penalties, resulting in economic losses. The study was conducted by collecting data on the duration of each production process activity and calculating using the CPM (Critical Path Method) method and then analyzing the critical path and activities and optimum time. Based on the CPM calculation, the critical path is obtained, namely the 2nd activity path with the series AàCàDàEàGàHàIàJàK. The calculation results show that the total optimal time obtained is 19.5 hours, in other words 4.5 hours faster than the company's actual production time, which is 24 hours for 1 carpet. This time optimization leads to cost savings of IDR 3,920,000.

MDP Student ConferenceVol. 4(2)
Openalex Percentile: Top 85%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.