Exploring the Impact of BIM on Construction Project in Reducing Life Cycle Cost

Building Information Modeling (BIM) has emerged as a transformative force in the construction industry, offering a multidimensional, collaborative platform that integrates planning, design, construction, and facility management. This paper explores the role of BIM in reducing life cycle costs (LCC) by optimizing time and cost throughout all phases of a building’s life. The study focuses on practical applications of BIM tools such as Autodesk Revit, Navisworks, and CostX to demonstrate how they contribute to improved cost estimation accuracy, clash detection, 4D scheduling, and 5D cost modeling. Using comparative analysis with traditional methods, and a case study based on a 2BHK residential unit, the research illustrates significant reductions in construction time, material waste, and financial overruns. The paper also examines the sustainability benefits of BIM, its integration with AI and digital twins, and policy recommendations to improve its adoption. Findings confirm that BIM is a crucial technology for achieving financial efficiency, sustainability, and productivity in construction, and that it should be considered an industry standard for future-ready infrastructure development.

Authors

Publication Details

Journal
Journal of Information Systems Engineering & Management
Published
2025-03-21
DOI
https://doi.org/10.52783/jisem.v10i23s.8166
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the Impact of BIM on Construction Project in Reducing Life Cycle Cost

Sunil Sharma
Journal of Information Systems Engineering & Management
BIM and Construction Integration
article

Exploring the Impact of BIM on Construction Project in Reducing Life Cycle Cost

Sunil Sharma
article en

Abstract

Building Information Modeling (BIM) has emerged as a transformative force in the construction industry, offering a multidimensional, collaborative platform that integrates planning, design, construction, and facility management. This paper explores the role of BIM in reducing life cycle costs (LCC) by optimizing time and cost throughout all phases of a building’s life. The study focuses on practical applications of BIM tools such as Autodesk Revit, Navisworks, and CostX to demonstrate how they contribute to improved cost estimation accuracy, clash detection, 4D scheduling, and 5D cost modeling. Using comparative analysis with traditional methods, and a case study based on a 2BHK residential unit, the research illustrates significant reductions in construction time, material waste, and financial overruns. The paper also examines the sustainability benefits of BIM, its integration with AI and digital twins, and policy recommendations to improve its adoption. Findings confirm that BIM is a crucial technology for achieving financial efficiency, sustainability, and productivity in construction, and that it should be considered an industry standard for future-ready infrastructure development.

Journal of Information Systems Engineering & ManagementVol. 10(23s)
Openalex Percentile: Top 90%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.