Risk integrated effort estimation of software projects: a comparative analysis of machine learning techniques

Accurate software project effort estimation and risk management are the pillars of delivering an on-time, within budget and quality project. In our earlier research, a formula for computing risk integrated effort estimate by adding weighted cost of risk management for each project cost factor to the cost of initial effort estimate of the project has been proposed. In this research, neural network techniques: multilayer perceptron (MLP), general regression neural network (GRNN), cascade correlation neural network (CCNN) and radial bias function neural network (RBFNN); support vector regression (SVR), and adaptive neuro fuzzy inference system (ANFIS) to obtain the integrated effort estimate as close as possible to the actual effort spent on the project have been applied. The techniques have been tested on two datasets: Agile and Waterfall datasets. GRNN gave the best results in terms of lowest values of accuracy measures: mean absolute error (MAE), mean magnitude of relative error (MMRE), mean balanced relative error (MBRE), and mean inverted balanced relative error (MIBRE). This research also compares performance of GRNN with evolutionary algorithms artificial bee colony (ABC), particle swarm optimisation (PSO) and global local binary particle swarm optimisation (GLBPSO), and the results for GRNN are comparable.

Authors

Institutions

Publication Details

Journal
International Journal of System of Systems Engineering
Published
2025-01-01
DOI
https://doi.org/10.1504/ijsse.2025.146198
Citations
1
Primary Topic
Software Engineering Research
Type
article
Field-Weighted Citation Impact
3.25
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk integrated effort estimation of software projects: a comparative analysis of machine learning techniques

A. Charan Kumari, Prerna Singal, Prabha Sharma
1 citations
International Journal of System of Systems Engineering
Software Engineering Research
3.25
article

Risk integrated effort estimation of software projects: a comparative analysis of machine learning techniques

A. Charan Kumari, Prerna Singal, Prabha Sharma
article en
1 citations

Abstract

Accurate software project effort estimation and risk management are the pillars of delivering an on-time, within budget and quality project. In our earlier research, a formula for computing risk integrated effort estimate by adding weighted cost of risk management for each project cost factor to the cost of initial effort estimate of the project has been proposed. In this research, neural network techniques: multilayer perceptron (MLP), general regression neural network (GRNN), cascade correlation neural network (CCNN) and radial bias function neural network (RBFNN); support vector regression (SVR), and adaptive neuro fuzzy inference system (ANFIS) to obtain the integrated effort estimate as close as possible to the actual effort spent on the project have been applied. The techniques have been tested on two datasets: Agile and Waterfall datasets. GRNN gave the best results in terms of lowest values of accuracy measures: mean absolute error (MAE), mean magnitude of relative error (MMRE), mean balanced relative error (MBRE), and mean inverted balanced relative error (MIBRE). This research also compares performance of GRNN with evolutionary algorithms artificial bee colony (ABC), particle swarm optimisation (PSO) and global local binary particle swarm optimisation (GLBPSO), and the results for GRNN are comparable.

International Journal of System of Systems EngineeringVol. 15(2)
The NorthCap University (IN), Dayalbagh Educational Institute (IN)
Industry, innovation and infrastructure
Openalex Percentile: Top 9%
Software Engineering Research
3.25
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk integrated effort estimation of software projects: a comparative analysis of machine learning techniques — A. Charan Kumari, Prerna Singal, et al. · International Journal of System of Systems Engineering (2025) | TGRS Research Map | TGRS