Analysis of the Operation of Remote Backup Protection on 110kV Overhead Lines When Connecting an Intermediate Power Source

Currently, there is a trend towards building their own generation among industrial enterprises, when owners, against the background of news about a possible shortage of capacity and an increase in the cost of electricity, are thinking about building their own generating plants. The implementation of these solutions on dead-end power transmission lines leads to problems in providing remote backup with a set of step protections on these lines. As part of this paper, the influence of connecting an intermediate power source to unsoldered transformers on measuring resistance at the protection installation site is proved. A formula has been obtained describing the effect of the rated power of an intermediate power source on the current measurement value at the protection installation site. A computational model has been created in the PSCAD software package, and a simplified algorithm for activating remote backup protection has been modeled. It was found that increasing the rated power of the intermediate power supply shifts the value of the resistance measurement to the left.

Authors

Institutions

Publication Details

Published
2025-04-08
DOI
https://doi.org/10.1109/reepe63962.2025.10970763
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the Operation of Remote Backup Protection on 110kV Overhead Lines When Connecting an Intermediate Power Source

R. Isakov, Vildan R. Sagirov
Railway Systems and Energy Efficiency
article

Analysis of the Operation of Remote Backup Protection on 110kV Overhead Lines When Connecting an Intermediate Power Source

R. Isakov, Vildan R. Sagirov
article en

Abstract

Currently, there is a trend towards building their own generation among industrial enterprises, when owners, against the background of news about a possible shortage of capacity and an increase in the cost of electricity, are thinking about building their own generating plants. The implementation of these solutions on dead-end power transmission lines leads to problems in providing remote backup with a set of step protections on these lines. As part of this paper, the influence of connecting an intermediate power source to unsoldered transformers on measuring resistance at the protection installation site is proved. A formula has been obtained describing the effect of the rated power of an intermediate power source on the current measurement value at the protection installation site. A computational model has been created in the PSCAD software package, and a simplified algorithm for activating remote backup protection has been modeled. It was found that increasing the rated power of the intermediate power supply shifts the value of the resistance measurement to the left.

Kazan State Power Engineering University (RU)
Affordable and clean energy
Openalex Percentile: Top 86%
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.