A Decomposition-Based Hybrid Algorithm for Large-Scale Project Portfolio Selection and Scheduling With Reaction to Changing Environments
The project portfolio selection and scheduling problem (PPSSP) aims to select and schedule a set of projects, known as a portfolio, to maximize their benefits while adhering to various constraints. However, addressing PPSSP in a reasonable time becomes increasingly challenging with a growing number of projects, especially in changing environments. This paper proposes a decomposition-based hybrid algorithm with evolutionary algorithm-based global search and exact solverbased local search to optimize large-scale PPSSP, and integrates a reactive approach to re-optimize PPSSP when unexpected changes occur. Specifically, a heuristic solution repair method is designed to accelerate the evolutionary global search, which is then expanded to repair the baseline schedule when dealing with changes. A problem-specific grouping method and a constrained sub-problem construction approach are developed for conducting the cooperative local search using the exact solver. Besides, a reactive approach is crafted to deal with changing circumstances by updating the problem structure, repairing the pre-scheduled solution, and re-optimizing the solutions. Experiments conducted on 28 large-scale PPSSPs and 28 changed PPSSPs have validated the superiority of the proposed hybrid algorithm in achieving competitive results in a shorter time, saving up to 57% computational time to achieve high-quality solutions when compared to the exact solver Gurobi.
Authors
- Daryl Essam (ORCID: https://orcid.org/0000-0002-6923-7079)
- Ruhul Sarker (ORCID: https://orcid.org/0000-0002-1363-2774)
- Saber Elsayed (ORCID: https://orcid.org/0000-0003-0836-6122)
- Jing Liu (ORCID: https://orcid.org/0000-0003-3600-4647)
Institutions
- University of Canberra (AU)
- University of Sharjah (AE)
- UNSW Sydney (AU)
Publication Details
- Journal
- IEEE Transactions on Engineering Management
- Published
- 2025-01-01
- DOI
- https://doi.org/10.1109/tem.2025.3568826
- Citations
- 3
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 6.32