Progressive Linear Programming Optimality Method Based on Decomposing Nonlinear Functions for Short-Term Cascade Hydropower Scheduling

Short-term optimal scheduling of cascade hydropower stations enhances their flexible regulation and power generation capabilities. However, nonlinear function relationships and multistage and hydraulic interdependencies present significant challenges, resulting in considerable solution errors, premature convergence, and high computational demands. This study proposes a progressive linear programming method that decomposes nonlinear functions to address these challenges. First, to accurately represent nonlinear functions and mitigate computational complexity, the entire feasible domain is partitioned into multiple contiguous subdomains in which nonconvex nonlinear functions within each subdomain can be equivalently replaced by linear relationships. Second, a progressive linear programming optimization algorithm is devised to prevent premature convergence, utilizing continuous subdomains rather than discrete points as state variables and incorporating the progressive optimality principle. Finally, to increase the solution efficiency, a dimensionality reduction strategy via the feasible domain state dynamic acquisition method is presented and optimized after excluding the infeasible states in each stage. The simulation of three cascade hydropower stations in a river basin in southwest China shows that the proposed method can achieve a superior peak regulation effect compared to the conventional mixed integer linear programming and progressive optimality algorithm. During the dry and wet seasons, the residual load peak–valley differences at the three stations are reduced by 612 MW and 521 MW compared to the MILP and 1889 MW and 2439 MW compared to the POA, which underscores the effectiveness of the method in optimizing the short-term scheduling of cascade hydropower stations.

Authors

Institutions

Publication Details

Journal
Water
Published
2025-05-10
DOI
https://doi.org/10.3390/w17101441
Citations
3
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
3.44
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progressive Linear Programming Optimality Method Based on Decomposing Nonlinear Functions for Short-Term Cascade Hydropower Scheduling

Zhou Fang, Tao Wang, Yang Xu, Jia Lu et al.
3 citations
Water
Water resources management and optimization
3.44
article

Progressive Linear Programming Optimality Method Based on Decomposing Nonlinear Functions for Short-Term Cascade Hydropower Scheduling

Zhou Fang, Tao Wang, Yang Xu, Jia Lu, Zheng Zhang, Yaxin Liu, Yuqi Yang
article en
3 citations

Abstract

Short-term optimal scheduling of cascade hydropower stations enhances their flexible regulation and power generation capabilities. However, nonlinear function relationships and multistage and hydraulic interdependencies present significant challenges, resulting in considerable solution errors, premature convergence, and high computational demands. This study proposes a progressive linear programming method that decomposes nonlinear functions to address these challenges. First, to accurately represent nonlinear functions and mitigate computational complexity, the entire feasible domain is partitioned into multiple contiguous subdomains in which nonconvex nonlinear functions within each subdomain can be equivalently replaced by linear relationships. Second, a progressive linear programming optimization algorithm is devised to prevent premature convergence, utilizing continuous subdomains rather than discrete points as state variables and incorporating the progressive optimality principle. Finally, to increase the solution efficiency, a dimensionality reduction strategy via the feasible domain state dynamic acquisition method is presented and optimized after excluding the infeasible states in each stage. The simulation of three cascade hydropower stations in a river basin in southwest China shows that the proposed method can achieve a superior peak regulation effect compared to the conventional mixed integer linear programming and progressive optimality algorithm. During the dry and wet seasons, the residual load peak–valley differences at the three stations are reduced by 612 MW and 521 MW compared to the MILP and 1889 MW and 2439 MW compared to the POA, which underscores the effectiveness of the method in optimizing the short-term scheduling of cascade hydropower stations.

WaterVol. 17(10)
Dalian University of Technology (CN), Yangtze River Pharmaceutical Group (China) (CN)
Openalex Percentile: Top 8%
Water resources management and optimization
3.44
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.