Intelligent GPR Detection of Backfill Grouting Quality and Adjacent Soil Cavities in Shield Tunnels: A Case Study

During the construction of shield tunnels, backfill grouting behind segmental linings is a crucial technique for filling the shield tail gap resulting from over‐excavation by the cutter head. Direct observation of grouting thickness distribution is challenging, necessitating nondestructive testing (NDT) technologies like ground‐penetrating radar (GPR). This study introduces a loaded‐to‐frame (LTF) device designed to automate the collection and intelligent analysis of GPR data, enabling rapid and intelligent detection of grouting thickness distribution and adjacent soil cavities in the excavation area. Focusing on the complex geological and environmental conditions of Xiamen Metro Line 3, the research highlights the critical role of grouting quality and cavity detection in ensuring tunnel construction safety and surface stability. Time domain reflectometry was employed to assess the electrical properties of the grouting materials, revealing a 12‐h relative dielectric constant of 24.08 and conductivity of 4.29 mS/m. These properties significantly differ from those of the surrounding soil, confirming the suitability of GPR for detection. The LTF device, combined with its intelligent analysis system, can complete automated and efficient detection of single‐ring shield tunnels within 5 min, providing dynamic feedback on grouting quality control. Furthermore, the study validates the feasibility of using the LTF device to detect adjacent soil cavities during tunnel excavation. This research advances the automation and intelligence of backfill grouting and cavity detection, supporting the safe and efficient progress of shield tunnel construction.

Authors

Institutions

Publication Details

Journal
Advances in Civil Engineering
Published
2025-01-01
DOI
https://doi.org/10.1155/adce/5558241
Citations
1
Primary Topic
Geophysical Methods and Applications
Type
article
Field-Weighted Citation Impact
1.15

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent GPR Detection of Backfill Grouting Quality and Adjacent Soil Cavities in Shield Tunnels: A Case Study

Guojun Cai, Kang Li, Xiongyao Xie
1 citations
Advances in Civil Engineering
Geophysical Methods and Applications
1.15
article

Intelligent GPR Detection of Backfill Grouting Quality and Adjacent Soil Cavities in Shield Tunnels: A Case Study

Guojun Cai, Kang Li, Xiongyao Xie
article en
1 citations

Abstract

During the construction of shield tunnels, backfill grouting behind segmental linings is a crucial technique for filling the shield tail gap resulting from over‐excavation by the cutter head. Direct observation of grouting thickness distribution is challenging, necessitating nondestructive testing (NDT) technologies like ground‐penetrating radar (GPR). This study introduces a loaded‐to‐frame (LTF) device designed to automate the collection and intelligent analysis of GPR data, enabling rapid and intelligent detection of grouting thickness distribution and adjacent soil cavities in the excavation area. Focusing on the complex geological and environmental conditions of Xiamen Metro Line 3, the research highlights the critical role of grouting quality and cavity detection in ensuring tunnel construction safety and surface stability. Time domain reflectometry was employed to assess the electrical properties of the grouting materials, revealing a 12‐h relative dielectric constant of 24.08 and conductivity of 4.29 mS/m. These properties significantly differ from those of the surrounding soil, confirming the suitability of GPR for detection. The LTF device, combined with its intelligent analysis system, can complete automated and efficient detection of single‐ring shield tunnels within 5 min, providing dynamic feedback on grouting quality control. Furthermore, the study validates the feasibility of using the LTF device to detect adjacent soil cavities during tunnel excavation. This research advances the automation and intelligence of backfill grouting and cavity detection, supporting the safe and efficient progress of shield tunnel construction.

Advances in Civil EngineeringVol. 2025(1)
Tongji University (CN), Geological Society of America (US), Xiamen Institute of Building Research Group (CN)
National Natural Science Foundation of China, Science and Technology Commission of Shanghai Municipality, National Key Research and Development Program of China, State Grid Shanghai Municipal Electric Power Company, Science and Technology Innovation Plan Of Shanghai Science and Technology Commission
Openalex Percentile: Top 24%
Geophysical Methods and Applications
1.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.