Natural Disasters and Built Environment: Reconstruction and Rehabilitation after the Earthquake (2005) in Balakot, Pakistan

After the earthquake and the loss of life and property, the reconstruction and rehabilitation process was challenging. It was also hotly debated and involved controversies. Large amounts of funds were used to help the victims of the earthquake. Some of these funds were made available immediately. Some funds were promised as pledges to be paid over time and were for the reconstruction, rebuilding, and rehabilitation of the people. On the other hand, the government, just as the area's people, found itself completely untrained and unprepared for a calamity of this size. The turning point in rebuilding and rehabilitation came in 2021 with a new plan from the government. While the project of New Balakot City remained intact, the new plan changed the nature and direction of the project by proposing the city be made a tourist destination. In the long run, the process of rebuilding and reconstruction failed.

Authors

Institutions

Publication Details

Journal
Global Social Sciences Review
Published
2025-05-10
DOI
https://doi.org/10.31703/gssr.2025(x-i).24
Primary Topic
Disaster Management and Resilience
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Natural Disasters and Built Environment: Reconstruction and Rehabilitation after the Earthquake (2005) in Balakot, Pakistan

Muhammad Ayub Jan, Syed Sami Raza, Ghazala Rafi
Global Social Sciences Review
Disaster Management and Resilience
article

Natural Disasters and Built Environment: Reconstruction and Rehabilitation after the Earthquake (2005) in Balakot, Pakistan

Muhammad Ayub Jan, Syed Sami Raza, Ghazala Rafi
article en

Abstract

After the earthquake and the loss of life and property, the reconstruction and rehabilitation process was challenging. It was also hotly debated and involved controversies. Large amounts of funds were used to help the victims of the earthquake. Some of these funds were made available immediately. Some funds were promised as pledges to be paid over time and were for the reconstruction, rebuilding, and rehabilitation of the people. On the other hand, the government, just as the area's people, found itself completely untrained and unprepared for a calamity of this size. The turning point in rebuilding and rehabilitation came in 2021 with a new plan from the government. While the project of New Balakot City remained intact, the new plan changed the nature and direction of the project by proposing the city be made a tourist destination. In the long run, the process of rebuilding and reconstruction failed.

Global Social Sciences ReviewVol. 10(I)
University of Peshawar (PK)
Openalex Percentile: Top 87%
Disaster Management and Resilience
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.