Studi Perencanaan Pembangkit Listrik Hibrid di Kelompok Ternak Sukamaju II

This study focuses on the generation of energy from biogas and solar power into electricity in Purwodadi Dalam Village. It focuses on assessing both technical and economic feasibility, alongside the environmental benefits of reducing greenhouse gas emissions. The findings indicate that hybrid power plants have the capability to generate 76.365 kWh/year, 132.812 kWh/year, and 17.062 kWh/year, utilizing readily available raw materials. From an economic perspective, the project is projected to achieve net present values of Rp.327.085.000 and Rp.726.808.000, a benefit-cost ratio of 1.99 and 3.21, and investment payback periods of 6 years 9 months and 3 years 15 days. Additionally, the project offers a significant reduction in emissions, with potential reductions of 618,894 tCO2/year, 618,894 tCO2/year, and 18.30 tCO2/year. These results suggest that the development of this renewable energy project is both technically and economically viable

Authors

Institutions

Publication Details

Journal
Electrician Jurnal Rekayasa dan Teknologi Elektro
Published
2025-05-09
DOI
https://doi.org/10.23960/elc.v19n2.2797
Primary Topic
Livestock Farming and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Studi Perencanaan Pembangkit Listrik Hibrid di Kelompok Ternak Sukamaju II

Ferizandi Qauzar Gani
Electrician Jurnal Rekayasa dan Teknologi Elektro
Livestock Farming and Management
article

Studi Perencanaan Pembangkit Listrik Hibrid di Kelompok Ternak Sukamaju II

Ferizandi Qauzar Gani
article en

Abstract

This study focuses on the generation of energy from biogas and solar power into electricity in Purwodadi Dalam Village. It focuses on assessing both technical and economic feasibility, alongside the environmental benefits of reducing greenhouse gas emissions. The findings indicate that hybrid power plants have the capability to generate 76.365 kWh/year, 132.812 kWh/year, and 17.062 kWh/year, utilizing readily available raw materials. From an economic perspective, the project is projected to achieve net present values of Rp.327.085.000 and Rp.726.808.000, a benefit-cost ratio of 1.99 and 3.21, and investment payback periods of 6 years 9 months and 3 years 15 days. Additionally, the project offers a significant reduction in emissions, with potential reductions of 618,894 tCO2/year, 618,894 tCO2/year, and 18.30 tCO2/year. These results suggest that the development of this renewable energy project is both technically and economically viable

Electrician Jurnal Rekayasa dan Teknologi ElektroVol. 19(2)
Sumatera Institute of Technology (ID)
Openalex Percentile: Top 87%
Livestock Farming and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.