Mudlogging Service Performance Evaluation In Offshore Mahakam: A Case Study on The Consortium Contract Within PT PHM

PT Pertamina Hulu Mahakam (PHM) is an oil and gas exploration and production operator in the Mahakam block, East Kalimantan, and conducts drilling operations for development and exploration wells using five offshore rigs. Mudlogging services are crucial for real-time geological monitoring and operational safety in offshore drilling. Mudlogging plays a crucial role in maintaining well integrity and enhancing drilling efficiency. From 2019, these services have been delivered through two major contracts, one awarded to PTGI and the other to a consortium between PTEN and PTGS. However, the second period (2022-2024) saw a sharp decline in performance, resulting in an estimated USD 350,000 in rig standby costs. This research aims to identify the root causes of the decline in mudlogging performance and propose practical improvement strategies to restore operational reliability and minimize non-productive time (NPT). A mixed-method approach was adopted, combining structured interviews with key stakeholders, and Likert-scale questionnaires were collected from the stakeholders and expert. Qualitative data analysis, utilizing root cause methodologies, fishbone diagrams, and current reality trees (CRTs), revealed that the absence of clear governance structures and role clarity led to weak coordination, delayed decisions, ineffective communication, and inadequate technical oversight. Insufficient training, high turnover, and limited motivation among contracted personnel in one of the consortium company were also identified as contributing factors in this research. The analytic hierarchy process (AHP) was applied to prioritize improvement strategies, with restructuring the consortium scoring highest and training enhancement being the most impactful levers for restoring performance.

Authors

Institutions

Publication Details

Journal
Journal Research of Social Science Economics and Management
Published
2025-05-09
DOI
https://doi.org/10.59141/jrssem.v4i9.807
Primary Topic
Outsourcing and Supply Chain Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mudlogging Service Performance Evaluation In Offshore Mahakam: A Case Study on The Consortium Contract Within PT PHM

Akbar Adhiutama, Rio Sitorus
Journal Research of Social Science Economics and Management
Outsourcing and Supply Chain Management
article

Mudlogging Service Performance Evaluation In Offshore Mahakam: A Case Study on The Consortium Contract Within PT PHM

Akbar Adhiutama, Rio Sitorus
article en

Abstract

PT Pertamina Hulu Mahakam (PHM) is an oil and gas exploration and production operator in the Mahakam block, East Kalimantan, and conducts drilling operations for development and exploration wells using five offshore rigs. Mudlogging services are crucial for real-time geological monitoring and operational safety in offshore drilling. Mudlogging plays a crucial role in maintaining well integrity and enhancing drilling efficiency. From 2019, these services have been delivered through two major contracts, one awarded to PTGI and the other to a consortium between PTEN and PTGS. However, the second period (2022-2024) saw a sharp decline in performance, resulting in an estimated USD 350,000 in rig standby costs. This research aims to identify the root causes of the decline in mudlogging performance and propose practical improvement strategies to restore operational reliability and minimize non-productive time (NPT). A mixed-method approach was adopted, combining structured interviews with key stakeholders, and Likert-scale questionnaires were collected from the stakeholders and expert. Qualitative data analysis, utilizing root cause methodologies, fishbone diagrams, and current reality trees (CRTs), revealed that the absence of clear governance structures and role clarity led to weak coordination, delayed decisions, ineffective communication, and inadequate technical oversight. Insufficient training, high turnover, and limited motivation among contracted personnel in one of the consortium company were also identified as contributing factors in this research. The analytic hierarchy process (AHP) was applied to prioritize improvement strategies, with restructuring the consortium scoring highest and training enhancement being the most impactful levers for restoring performance.

Journal Research of Social Science Economics and ManagementVol. 4(9)
Bandung Institute of Technology (ID)
Openalex Percentile: Top 84%
Outsourcing and Supply Chain Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.