Evaluating Battery Energy Storage System (BESS) Sizing for Substation Investment Deferral Using Load Profile Analysis in Thailand

As Thailand's electricity demand continues to rise due to rapid economic and industrial development, there is a need to find new approaches to maintain grid stability and defer costly infrastructure investments. This study introduces a method to determine the optimal battery size for battery energy storage systems (BESS) in distributed substations, focusing on addressing peak demand exceeding transformer (TR) capacity. By analysing load profiles and growth rates, the method identifies the first year of overload, overload periods, and corresponding BESS capacity requirements. Key parameters, including the energy needed for discharging (Eneed) and energy available for charging (Eallow), were used to define the BESS size and optimize its operation based on electricity tariff periods in Thailand. Among different characteristics of load profile patterns, load profiles with a distinct difference between peak-time overload and off-peak low consumption demonstrated the greatest potential for delaying substation upgrades, enabling deferral periods of up to 9 years. In contrast, load profiles with flatter demand patterns exhibited limited potential for investment deferral. The finding highlights that BESS size is significantly influenced by the gradual decrease in Eallow and the increase in Eneed over time, driven by load growth. Future research should explore additional factors such as investment and maintenance costs, cost-benefit analyses, and alternative strategies to enhance substation investment deferral decisions.

Authors

Institutions

Publication Details

Journal
PaperAsia
Published
2025-05-09
DOI
https://doi.org/10.59953/paperasia.v41i3b.393
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating Battery Energy Storage System (BESS) Sizing for Substation Investment Deferral Using Load Profile Analysis in Thailand

Chakphed Madtharad, Nipon Ketjoy, Tawat Suriwong, Sorawut Jittanon et al.
PaperAsia
Power System Reliability and Maintenance
article

Evaluating Battery Energy Storage System (BESS) Sizing for Substation Investment Deferral Using Load Profile Analysis in Thailand

Chakphed Madtharad, Nipon Ketjoy, Tawat Suriwong, Sorawut Jittanon, Wisut Chamsa-ard, Temsiri Prompook
article en

Abstract

As Thailand's electricity demand continues to rise due to rapid economic and industrial development, there is a need to find new approaches to maintain grid stability and defer costly infrastructure investments. This study introduces a method to determine the optimal battery size for battery energy storage systems (BESS) in distributed substations, focusing on addressing peak demand exceeding transformer (TR) capacity. By analysing load profiles and growth rates, the method identifies the first year of overload, overload periods, and corresponding BESS capacity requirements. Key parameters, including the energy needed for discharging (Eneed) and energy available for charging (Eallow), were used to define the BESS size and optimize its operation based on electricity tariff periods in Thailand. Among different characteristics of load profile patterns, load profiles with a distinct difference between peak-time overload and off-peak low consumption demonstrated the greatest potential for delaying substation upgrades, enabling deferral periods of up to 9 years. In contrast, load profiles with flatter demand patterns exhibited limited potential for investment deferral. The finding highlights that BESS size is significantly influenced by the gradual decrease in Eallow and the increase in Eneed over time, driven by load growth. Future research should explore additional factors such as investment and maintenance costs, cost-benefit analyses, and alternative strategies to enhance substation investment deferral decisions.

PaperAsiaVol. 41(3b)
Electricity Generating Authority of Thailand (TH), Naresuan University (TH)
Naresuan University
Openalex Percentile: Top 89%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluating Battery Energy Storage System (BESS) Sizing for Substation Investment Deferral Using Load Profile Analysis in Thailand — Chakphed Madtharad, Nipon Ketjoy, et al. · PaperAsia (2025) | TGRS Research Map | TGRS