Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project

With the rapid development of China's property industry, residential construction projects face significant schedule delays due to inadequate progress management. It makes it difficult for enterprises to realize the return of funds on time, causing economic losses and reputational damage which brings serious economic losses and loss of corporate reputation. This study aims to identify and prioritize delay factors and propose effective control measures. Qualitative research methods, including semi-structured interviews, are used to collect data from the Yun Yue Dong Fang residential project in China, a case study, and analyze the influencing factors of project schedule management. Like construction, design, materials, finance, communication, non-human elements, planning, and supervision. Results show construction factors (particularly execution efficiency, funding timeliness, and resource allocation) dominate, as evidenced by their highest word frequency in interview coding. Followed by client factors, while the factors related to the design teams, as well as the factors related to the raw material and equipment suppliers have less impact. The study proposes strengthening control through integrated management systems and real-time monitoring, validated by the case study, to mitigate delays. The results of the study provide actionable insights for optimizing schedule management in residential projects as well as the project schedule management of residential development enterprises and enhancing enterprise performance.

Authors

Institutions

Publication Details

Journal
Turkish Journal of Civil Engineering
Published
2025-05-09
DOI
https://doi.org/10.18400/tjce.1571706
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project

Khoo Terh Jing, Li Hong Yao, Liu Qing-hua, Yin Hengbing
2 citations
Turkish Journal of Civil Engineering
Construction Project Management and Performance
4.21
article

Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project

Khoo Terh Jing, Li Hong Yao, Liu Qing-hua, Yin Hengbing
article en
2 citations

Abstract

With the rapid development of China's property industry, residential construction projects face significant schedule delays due to inadequate progress management. It makes it difficult for enterprises to realize the return of funds on time, causing economic losses and reputational damage which brings serious economic losses and loss of corporate reputation. This study aims to identify and prioritize delay factors and propose effective control measures. Qualitative research methods, including semi-structured interviews, are used to collect data from the Yun Yue Dong Fang residential project in China, a case study, and analyze the influencing factors of project schedule management. Like construction, design, materials, finance, communication, non-human elements, planning, and supervision. Results show construction factors (particularly execution efficiency, funding timeliness, and resource allocation) dominate, as evidenced by their highest word frequency in interview coding. Followed by client factors, while the factors related to the design teams, as well as the factors related to the raw material and equipment suppliers have less impact. The study proposes strengthening control through integrated management systems and real-time monitoring, validated by the case study, to mitigate delays. The results of the study provide actionable insights for optimizing schedule management in residential projects as well as the project schedule management of residential development enterprises and enhancing enterprise performance.

Turkish Journal of Civil EngineeringVol. 36(6)
Hospital Universiti Sains Malaysia (MY)
Openalex Percentile: Top 7%
Construction Project Management and Performance
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.