Powering the blue economy through offshore vertical-axis wind and current turbines; from fundamental to two-phase flow experimental testing

Within the past few years an increased interest has been shown regarding marine renewable energy and its applications.The overall goal of this project was to develop and test an economically and technically feasible offshore platform to house a vertical axis wind turbine and an underwater current turbine, known as dual turbine platform (DTP), that can provide sustainable and ecofriendly energy, relieving the operation of diesel generators for aquaculture farms.In an offshore DTP design, the wind interacts with the unsubmerged parts of the floating platform, wind turbine blades, hub, and tower, while the current and waves interact with the portion of the system that is submerged, i.e., mooring lines, current turbine, and submerged portion of the platform.This interaction between the fluid flow and the floating structure is known as Fluid-Structure Interaction (FSI), that can lead to excessive dynamic loads on the system and potentially could lead to instability and failure of the DTP.To commercially implement floating offshore platforms, it is critical that the platform remains stable in varying environmental and operational conditions.To study the offshore wind turbine's stability and energy output over a range of wind speeds and currents, there is an unmet need to have a testing facility capable of simulating a two-phase flow to mimic various ocean current and wind situations, simultaneously.On this basis, the first objective in the current study was to design and manufacture a small-scale wind tunnel that could be integrated into the existing recirculating water tunnel at the Fluid-Structure Interactions Laboratory at UMass Dartmouth, providing a two-phase flow testing facility, i.e., wind and water.With the small-scale test section of the flow channels, the second objective in the current study was to study the FSI response and stability of a DTP over a wide range of wind and current conditions.Accurate construction of the platform prototype and scaling of the surrounding conditions was achieved by using Froude Scaling and Actuator Disk Theory.Our in-house designed and manufactured two-phase flow channel facilitated our experimental stability study of the floating DTP over a wide range of wind and current conditions.

Authors

Publication Details

Published
2025-05-09
DOI
https://doi.org/10.18260/1-2-1139-55147
Primary Topic
Coastal and Marine Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Powering the blue economy through offshore vertical-axis wind and current turbines; from fundamental to two-phase flow experimental testing

Hamed Samandari, John Ross, Banafsheh Seyed-Aghazadeh, Sarah Dulac et al.
Coastal and Marine Management
article

Powering the blue economy through offshore vertical-axis wind and current turbines; from fundamental to two-phase flow experimental testing

Hamed Samandari, John Ross, Banafsheh Seyed-Aghazadeh, Sarah Dulac, José Gustavo Oliveira Silveira, D Durgin Gregory, Dmitri Souza, C. Jardin, Konrad Jamro, Andrea Elloian, Kevin Raggiani, Tyler Viera, Alec Peinkofer
article en

Abstract

Within the past few years an increased interest has been shown regarding marine renewable energy and its applications.The overall goal of this project was to develop and test an economically and technically feasible offshore platform to house a vertical axis wind turbine and an underwater current turbine, known as dual turbine platform (DTP), that can provide sustainable and ecofriendly energy, relieving the operation of diesel generators for aquaculture farms.In an offshore DTP design, the wind interacts with the unsubmerged parts of the floating platform, wind turbine blades, hub, and tower, while the current and waves interact with the portion of the system that is submerged, i.e., mooring lines, current turbine, and submerged portion of the platform.This interaction between the fluid flow and the floating structure is known as Fluid-Structure Interaction (FSI), that can lead to excessive dynamic loads on the system and potentially could lead to instability and failure of the DTP.To commercially implement floating offshore platforms, it is critical that the platform remains stable in varying environmental and operational conditions.To study the offshore wind turbine's stability and energy output over a range of wind speeds and currents, there is an unmet need to have a testing facility capable of simulating a two-phase flow to mimic various ocean current and wind situations, simultaneously.On this basis, the first objective in the current study was to design and manufacture a small-scale wind tunnel that could be integrated into the existing recirculating water tunnel at the Fluid-Structure Interactions Laboratory at UMass Dartmouth, providing a two-phase flow testing facility, i.e., wind and water.With the small-scale test section of the flow channels, the second objective in the current study was to study the FSI response and stability of a DTP over a wide range of wind and current conditions.Accurate construction of the platform prototype and scaling of the surrounding conditions was achieved by using Froude Scaling and Actuator Disk Theory.Our in-house designed and manufactured two-phase flow channel facilitated our experimental stability study of the floating DTP over a wide range of wind and current conditions.

Affordable and clean energy
Openalex Percentile: Top 86%
Coastal and Marine Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.