ANALISIS MANAJEMEN KONTRUKSI PROYEK PEMBANGUNAN GEDUNG PASCASARJANA UNIVERSITAS PENDIDIKAN INDONESIA (UPI) BANDUNG

Construction management is an effort to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities from the basic functions of project management, namely planning, implementing and controlling. Of the three activities, control is carried out on resources in a project which includes manpower, equipment (machine), materials (material), money (money) and methods (methods). The research aims to analyze the construction management of the construction project of the postgraduate building of the Indonesian University of Education (UPI) Bandung, planning the cost budget and scheduling using the Barchart, S Curve and Critical Path Method (CPM) methods. The results of this study show that the Budget Plan (RAB) obtained for the Postgraduate Building Construction Project of the University of Education of Indosesia (UPI) Bandung amounted to Rp 45,416,418,967, then the results of scheduling using barcharts and the S curve that this project took 32 weeks to complete the structural work, while the results of the Critical Path Method (CPM) analysis to complete this project took 224 days.

Authors

Publication Details

Journal
Jurnal Konstruksi dan Infrastruktur
Published
2025-03-06
DOI
https://doi.org/10.33603/jki.v12i1.9115
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALISIS MANAJEMEN KONTRUKSI PROYEK PEMBANGUNAN GEDUNG PASCASARJANA UNIVERSITAS PENDIDIKAN INDONESIA (UPI) BANDUNG

Fathur Rohman, Ohan Farhan, Andi Gunawan
Jurnal Konstruksi dan Infrastruktur
Occupational Health and Safety Management
article

ANALISIS MANAJEMEN KONTRUKSI PROYEK PEMBANGUNAN GEDUNG PASCASARJANA UNIVERSITAS PENDIDIKAN INDONESIA (UPI) BANDUNG

Fathur Rohman, Ohan Farhan, Andi Gunawan
article en

Abstract

Construction management is an effort to use limited resources efficiently, effectively and on time in completing a predetermined / planned project. There are 3 activities from the basic functions of project management, namely planning, implementing and controlling. Of the three activities, control is carried out on resources in a project which includes manpower, equipment (machine), materials (material), money (money) and methods (methods). The research aims to analyze the construction management of the construction project of the postgraduate building of the Indonesian University of Education (UPI) Bandung, planning the cost budget and scheduling using the Barchart, S Curve and Critical Path Method (CPM) methods. The results of this study show that the Budget Plan (RAB) obtained for the Postgraduate Building Construction Project of the University of Education of Indosesia (UPI) Bandung amounted to Rp 45,416,418,967, then the results of scheduling using barcharts and the S curve that this project took 32 weeks to complete the structural work, while the results of the Critical Path Method (CPM) analysis to complete this project took 224 days.

Jurnal Konstruksi dan InfrastrukturVol. 12(1)
Openalex Percentile: Top 85%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.