Replanning of The Wedi Irrigation Network System, Kapas District, Bojonegoro District

Kapas District is located in Bojonegoro Regency with an area of ​​2,927 ha of rice fields and 2,805 ha of irrigation land. The obstacle faced by farmers is the uneven availability of irrigation water. The irrigation area in Wedi Village is still simple irrigation by pumping river water next to it. This research aims to plan the irrigation network in Wedi, by calculating irrigation water needs and planning the dimensions of the irrigation channels. The algebraic method is used to calculate rainfall and calculate water needs using the Net Field Requirements (NFR) system. Water requirements at the beginning of planting in November I obtained a maximum value of 1.79 lt/s/ha, the alternative for beginning of planting in December I obtained a maximum value of 1.90 lt/s/ha, and the alternative for beginning of planting in December II obtained a value of 1.88 lt/s/ha. Results of overall water balance analysis for each month in 1 year with 3 alternative plantings with surplus results. The channel dimensions obtained are SP 1 = 1.4 m x 1 m, SP 2 = 1.4 m x 1 m, SP 3 = 1.2 m x 1 m, SP 4 = 1.2 m x 1 m, and for secondary channels the results are SS 1 = 0.6 m x 1 m , SS 2 = 0.8 m x 1 m, SS 3 = 0.6 m x 1 m , SS 4 = 0.6 m x 1 m = , SS 5 = 0.6 m x 1 m. Keyword: Network Planning, Plant_water_requirements, NFR, channel dimensions.

Authors

Publication Details

Journal
Journal of Green Science and Technology
Published
2025-04-03
DOI
https://doi.org/10.33603/jgst.v9i1.9638
Primary Topic
Fisheries and Aquaculture Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Replanning of The Wedi Irrigation Network System, Kapas District, Bojonegoro District

Mushthofa Mushthofa, A Riyadi, Yulia Indriani
Journal of Green Science and Technology
Fisheries and Aquaculture Studies
article

Replanning of The Wedi Irrigation Network System, Kapas District, Bojonegoro District

Mushthofa Mushthofa, A Riyadi, Yulia Indriani
article en

Abstract

Kapas District is located in Bojonegoro Regency with an area of ​​2,927 ha of rice fields and 2,805 ha of irrigation land. The obstacle faced by farmers is the uneven availability of irrigation water. The irrigation area in Wedi Village is still simple irrigation by pumping river water next to it. This research aims to plan the irrigation network in Wedi, by calculating irrigation water needs and planning the dimensions of the irrigation channels. The algebraic method is used to calculate rainfall and calculate water needs using the Net Field Requirements (NFR) system. Water requirements at the beginning of planting in November I obtained a maximum value of 1.79 lt/s/ha, the alternative for beginning of planting in December I obtained a maximum value of 1.90 lt/s/ha, and the alternative for beginning of planting in December II obtained a value of 1.88 lt/s/ha. Results of overall water balance analysis for each month in 1 year with 3 alternative plantings with surplus results. The channel dimensions obtained are SP 1 = 1.4 m x 1 m, SP 2 = 1.4 m x 1 m, SP 3 = 1.2 m x 1 m, SP 4 = 1.2 m x 1 m, and for secondary channels the results are SS 1 = 0.6 m x 1 m , SS 2 = 0.8 m x 1 m, SS 3 = 0.6 m x 1 m , SS 4 = 0.6 m x 1 m = , SS 5 = 0.6 m x 1 m. Keyword: Network Planning, Plant_water_requirements, NFR, channel dimensions.

Journal of Green Science and TechnologyVol. 9(1)
Openalex Percentile: Top 86%
Fisheries and Aquaculture Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.