Faktor-Faktor Manajemen Material dalam Percepatan Pelaksanaan Proyek Konstruksi Padang Pariaman

In the implementation of construction projects, the application of material management shows an influence on the smoothness of project work time, therefore it is necessary to examine and describe what parts of material management have an influence and how much influence they have. Based on literature studies and interviews and the author's experience as a project actor, a study was conducted to obtain the most influential factors in accelerating the implementation time of construction projects in Padang Pariaman Regency. The study was conducted using a Likert scale questionnaire method which was distributed to project actors as respondents and after that validity, reliability and factor analysis were tested on respondents' answers using SPSS. The results of the study obtained 2 new factors related to project material management, namely the first factor of inventory and warehousing control and the second factor was the factor of selecting specifications and material scheduling. The results obtained were quite unexpected because the specification selection factor is rarely discussed and used as a consideration when discussing the project implementation time, however, with the emergence of this factor, we as project actors are aware that this specification selection factor is very important in accelerating construction work in the Padang Pariaman Regency area.

Authors

Publication Details

Journal
Jurnal Civronlit Unbari
Published
2025-04-22
DOI
https://doi.org/10.33087/civronlit.v10i1.142
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Faktor-Faktor Manajemen Material dalam Percepatan Pelaksanaan Proyek Konstruksi Padang Pariaman

Dwifitra Y. Jumas, Eva Rita, R. Andriani
Jurnal Civronlit Unbari
Geotechnical and construction materials studies
article

Faktor-Faktor Manajemen Material dalam Percepatan Pelaksanaan Proyek Konstruksi Padang Pariaman

Dwifitra Y. Jumas, Eva Rita, R. Andriani
article en

Abstract

In the implementation of construction projects, the application of material management shows an influence on the smoothness of project work time, therefore it is necessary to examine and describe what parts of material management have an influence and how much influence they have. Based on literature studies and interviews and the author's experience as a project actor, a study was conducted to obtain the most influential factors in accelerating the implementation time of construction projects in Padang Pariaman Regency. The study was conducted using a Likert scale questionnaire method which was distributed to project actors as respondents and after that validity, reliability and factor analysis were tested on respondents' answers using SPSS. The results of the study obtained 2 new factors related to project material management, namely the first factor of inventory and warehousing control and the second factor was the factor of selecting specifications and material scheduling. The results obtained were quite unexpected because the specification selection factor is rarely discussed and used as a consideration when discussing the project implementation time, however, with the emergence of this factor, we as project actors are aware that this specification selection factor is very important in accelerating construction work in the Padang Pariaman Regency area.

Jurnal Civronlit UnbariVol. 10(1)
Openalex Percentile: Top 90%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.