Preventive Maintenance Analysis to Improve the Readiness of Heavy Equipment Hydraulic Excavator Liebherr R9250 & R9350 with Six Sigma Method at PT. XYZ

PT. XYZ is a company in the field of coal mining. The mining production process is carried out by open pit mining, meaning open mining. One of the activities carried out in the production process at PT. XYZ is overburden removal. The excavator used for overburden removal consists of 2 types Liebherr R9250 and R9350. Based on an initial survey, a breakdown occurred on the Liebherr R9250 excavator engine, experiencing a lubrication system failure, and the R9350 experienced a cooling system failure, so the engine was stuck. The purpose of this research is to overcome the problem of unscheduled unit breakdowns on Liebherr R9250 and R9350 hydraulic excavators at the coal mine project PT. XYZ using the Six Sigma method by formulating Define, Measure, Analyze, Improve, Control (DMAIC) that occurs. The results showed that the R9250 and R9350 excavators at the Six Sigma achievement level were in the 1-Sigma category or at the lowest level, with a very uncompetitive description of the quality of the unit's readiness during the production process. This shows that better improvement is needed to support the quality of unit readiness. Based on this research, the recommendations that can be given are that the company needs to improve human resources, monitor spare parts stock, implement maintenance methods, and improve the quality of unit readiness, operation of tools, customizing spare parts specifications, and provision of company facilities.

Authors

Publication Details

Journal
IJIEM - Indonesian Journal of Industrial Engineering and Management
Published
2025-03-20
DOI
https://doi.org/10.22441/ijiem.v5i3.22917
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preventive Maintenance Analysis to Improve the Readiness of Heavy Equipment Hydraulic Excavator Liebherr R9250 & R9350 with Six Sigma Method at PT. XYZ

Yudi Sukmono, Farida Djumiati Sitania, Icha Ayu Azzara Putri
IJIEM - Indonesian Journal of Industrial Engineering and Management
Management and Optimization Techniques
article

Preventive Maintenance Analysis to Improve the Readiness of Heavy Equipment Hydraulic Excavator Liebherr R9250 & R9350 with Six Sigma Method at PT. XYZ

Yudi Sukmono, Farida Djumiati Sitania, Icha Ayu Azzara Putri
article en

Abstract

PT. XYZ is a company in the field of coal mining. The mining production process is carried out by open pit mining, meaning open mining. One of the activities carried out in the production process at PT. XYZ is overburden removal. The excavator used for overburden removal consists of 2 types Liebherr R9250 and R9350. Based on an initial survey, a breakdown occurred on the Liebherr R9250 excavator engine, experiencing a lubrication system failure, and the R9350 experienced a cooling system failure, so the engine was stuck. The purpose of this research is to overcome the problem of unscheduled unit breakdowns on Liebherr R9250 and R9350 hydraulic excavators at the coal mine project PT. XYZ using the Six Sigma method by formulating Define, Measure, Analyze, Improve, Control (DMAIC) that occurs. The results showed that the R9250 and R9350 excavators at the Six Sigma achievement level were in the 1-Sigma category or at the lowest level, with a very uncompetitive description of the quality of the unit's readiness during the production process. This shows that better improvement is needed to support the quality of unit readiness. Based on this research, the recommendations that can be given are that the company needs to improve human resources, monitor spare parts stock, implement maintenance methods, and improve the quality of unit readiness, operation of tools, customizing spare parts specifications, and provision of company facilities.

IJIEM - Indonesian Journal of Industrial Engineering and ManagementVol. 5(3)
Openalex Percentile: Top 86%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Preventive Maintenance Analysis to Improve the Readiness of Heavy Equipment Hydraulic Excavator Liebherr R9250 & R9350 with Six Sigma Method at PT. XYZ — Yudi Sukmono, Farida Djumiati Sitania, et al. · IJIEM - Indonesian Journal of Industrial Engineering and Management (2025) | TGRS Research Map | TGRS