Measurement of Line Balancing in the Production Process Copper Cathode at PT. Smelting Using Ranked Positional Weight (RPW) Method

Line balancing is required in the production process. Without a balanced production line at work stations, the production process is less effective and efficient. Refinery at PT. Smelting has a type of mass production process, so it is planned to determine the optimal production line so that the loading on each work station will be more evenly distributed and reduce idle time. The method used is the measurement of working time with a stop watch. the data used is the work element and the time needed by the operator to complete the copper cathode production process which is from the anode arriving at the Anode Preparation Machine (APM) until the copper cathode is finished strapping at the Cathode Washing & Stripping Machine (CWSM). There are two results of the analysis,based on the first analysis that by using the line balancing method, the company can achieve a line efficiency of 78.10% and reduce the balance delay by 15.11% which is from 37.01% to 21.90%.

Authors

Publication Details

Journal
IJIEM - Indonesian Journal of Industrial Engineering and Management
Published
2025-03-20
DOI
https://doi.org/10.22441/ijiem.v5i3.23322
Primary Topic
Non-Destructive Testing Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Measurement of Line Balancing in the Production Process Copper Cathode at PT. Smelting Using Ranked Positional Weight (RPW) Method

Joumil Aidil Saifuddin, Muhammad Donny Putra Wardana
1 links
IJIEM - Indonesian Journal of Industrial Engineering and Management
Non-Destructive Testing Techniques
article

Measurement of Line Balancing in the Production Process Copper Cathode at PT. Smelting Using Ranked Positional Weight (RPW) Method

Joumil Aidil Saifuddin, Muhammad Donny Putra Wardana
article en

Abstract

Line balancing is required in the production process. Without a balanced production line at work stations, the production process is less effective and efficient. Refinery at PT. Smelting has a type of mass production process, so it is planned to determine the optimal production line so that the loading on each work station will be more evenly distributed and reduce idle time. The method used is the measurement of working time with a stop watch. the data used is the work element and the time needed by the operator to complete the copper cathode production process which is from the anode arriving at the Anode Preparation Machine (APM) until the copper cathode is finished strapping at the Cathode Washing & Stripping Machine (CWSM). There are two results of the analysis,based on the first analysis that by using the line balancing method, the company can achieve a line efficiency of 78.10% and reduce the balance delay by 15.11% which is from 37.01% to 21.90%.

IJIEM - Indonesian Journal of Industrial Engineering and ManagementVol. 5(3)
Openalex Percentile: Top 91%
Non-Destructive Testing Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.