PDDL Task Planning for Tunnel Spraying Based on a Multivariate Coating Accumulation Model

To address the challenges of low automation in tunnel wet-spraying jumbos and the heavy reliance on manual expertise for ensuring the spraying quality, this study proposes a novel task planning method for tunnel spraying operations. First, the tunnel surface to be sprayed is aligned with the designed contour using a vehicle navigation method, enabling the estimation of the overbreak and underbreak volumes. These volumes are then utilized to hierarchically plan the spraying tasks (e.g., patching, filling, and surface smoothing). A concrete coating thickness prediction method is developed, incorporating static and dynamic coating accumulation models with key process parameters—spraying flow rate Q, air pressure P, and spraying distance H—as independent variables. Based on the required thickness for each task layer, operational parameters such as the spraying duration t and nozzle movement speed v are optimized. By analyzing the spray gun action combinations and integrating hierarchical task planning with parameter optimization, a Planning Domain Definition Language (PDDL) domain file and problem file are designed to generate the spray gun action sequences and paths via a planner. The experimental results demonstrate that the overbreak volume on the sprayed tunnel surface is reduced to approximately 3 cm after applying the planned sequences. The proposed method autonomously generates the task hierarchies and the corresponding spray gun actions based on the 3D morphology of the tunnel surface, effectively ensuring the spraying quality while significantly reducing the dependence on manual intervention. This approach provides a practical solution for enhancing automation and precision in tunnel spraying operations.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-05-07
DOI
https://doi.org/10.3390/app15095187
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PDDL Task Planning for Tunnel Spraying Based on a Multivariate Coating Accumulation Model

Wenzheng Shi, Xin Sui, Chunyang Liu, Yan Huang et al.
Applied Sciences
Tunneling and Rock Mechanics
article

PDDL Task Planning for Tunnel Spraying Based on a Multivariate Coating Accumulation Model

Wenzheng Shi, Xin Sui, Chunyang Liu, Yan Huang, Kai Xu
article en

Abstract

To address the challenges of low automation in tunnel wet-spraying jumbos and the heavy reliance on manual expertise for ensuring the spraying quality, this study proposes a novel task planning method for tunnel spraying operations. First, the tunnel surface to be sprayed is aligned with the designed contour using a vehicle navigation method, enabling the estimation of the overbreak and underbreak volumes. These volumes are then utilized to hierarchically plan the spraying tasks (e.g., patching, filling, and surface smoothing). A concrete coating thickness prediction method is developed, incorporating static and dynamic coating accumulation models with key process parameters—spraying flow rate Q, air pressure P, and spraying distance H—as independent variables. Based on the required thickness for each task layer, operational parameters such as the spraying duration t and nozzle movement speed v are optimized. By analyzing the spray gun action combinations and integrating hierarchical task planning with parameter optimization, a Planning Domain Definition Language (PDDL) domain file and problem file are designed to generate the spray gun action sequences and paths via a planner. The experimental results demonstrate that the overbreak volume on the sprayed tunnel surface is reduced to approximately 3 cm after applying the planned sequences. The proposed method autonomously generates the task hierarchies and the corresponding spray gun actions based on the 3D morphology of the tunnel surface, effectively ensuring the spraying quality while significantly reducing the dependence on manual intervention. This approach provides a practical solution for enhancing automation and precision in tunnel spraying operations.

Applied SciencesVol. 15(9)
Henan University of Science and Technology (CN), Zhongshan Hospital (CN), Luoyang Institute of Science and Technology (CN)
Openalex Percentile: Top 90%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.