Mechanism of Asset Devaluation in the Planning Stage of Urban Rail Transit PPP Projects in China: A System Dynamics Approach

Urban rail transit public–private partnership (PPP) projects are characterized by their significant public attributes and strong externalities. They often exhibit low profitability and require substantial capital for operation. Coupled with the absence of a robust payment guarantee system, these factors can easily result in the asset value of PPP projects in the market failing to meet anticipated targets. This situation frequently leads to a proliferation of inefficient and ineffective investments related to assets each year, posing a risk of asset devaluation. Based on a retrospective analysis and categorization of previous research topics, the performance of asset devaluation can be divided into two distinct types: cost-driven asset devaluation and functional asset devaluation. Cost-driven asset devaluation is defined as cost overruns in a PPP project, while functional asset devaluation refers to functional redundancy resulting from agreed-upon functions in a project that either fails to meet public demand or exceeds it. The asset planning phase represents the most vital and pivotal link within the entire asset lifecycle management. The rationality of goal setting directly influences the government’s subsequent project expenditures. Consequently, this paper adopts an array of methodologies to thoroughly examine the influence mechanism of asset devaluation in the asset planning stage. First, risk factors (R) contributing to asset devaluation were identified by integrating literature reviews, case studies, and expert (E) interviews. Second, system dynamics modeling was utilized to articulate the relationships among these risk factors. Finally, this study utilized the simulation modeling of the Beijing Metro Line 4 project to identify the critical risk factors affecting cost-driven asset devaluation and functional asset devaluation, respectively: the reasonableness of return mechanism measurement and the reasonableness of market forecast. The critical factors impacting both cost-driven and functional asset devaluation were identified as: professionalism in feasibility study preparation, and clarity of risk-sharing framework, among others. Findings enrich the research on asset management in PPP projects and provide theoretical guidance for the accurate diagnosis and precise prevention of asset devaluation.

Authors

Institutions

Publication Details

Journal
Journal of Infrastructure Systems
Published
2025-05-07
DOI
https://doi.org/10.1061/jitse4.iseng-2585
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mechanism of Asset Devaluation in the Planning Stage of Urban Rail Transit PPP Projects in China: A System Dynamics Approach

Shaoyan Wu, Yong Jiang, Qingxiang Su
Journal of Infrastructure Systems
Public-Private Partnership Projects
article

Mechanism of Asset Devaluation in the Planning Stage of Urban Rail Transit PPP Projects in China: A System Dynamics Approach

Shaoyan Wu, Yong Jiang, Qingxiang Su
article en

Abstract

Urban rail transit public–private partnership (PPP) projects are characterized by their significant public attributes and strong externalities. They often exhibit low profitability and require substantial capital for operation. Coupled with the absence of a robust payment guarantee system, these factors can easily result in the asset value of PPP projects in the market failing to meet anticipated targets. This situation frequently leads to a proliferation of inefficient and ineffective investments related to assets each year, posing a risk of asset devaluation. Based on a retrospective analysis and categorization of previous research topics, the performance of asset devaluation can be divided into two distinct types: cost-driven asset devaluation and functional asset devaluation. Cost-driven asset devaluation is defined as cost overruns in a PPP project, while functional asset devaluation refers to functional redundancy resulting from agreed-upon functions in a project that either fails to meet public demand or exceeds it. The asset planning phase represents the most vital and pivotal link within the entire asset lifecycle management. The rationality of goal setting directly influences the government’s subsequent project expenditures. Consequently, this paper adopts an array of methodologies to thoroughly examine the influence mechanism of asset devaluation in the asset planning stage. First, risk factors (R) contributing to asset devaluation were identified by integrating literature reviews, case studies, and expert (E) interviews. Second, system dynamics modeling was utilized to articulate the relationships among these risk factors. Finally, this study utilized the simulation modeling of the Beijing Metro Line 4 project to identify the critical risk factors affecting cost-driven asset devaluation and functional asset devaluation, respectively: the reasonableness of return mechanism measurement and the reasonableness of market forecast. The critical factors impacting both cost-driven and functional asset devaluation were identified as: professionalism in feasibility study preparation, and clarity of risk-sharing framework, among others. Findings enrich the research on asset management in PPP projects and provide theoretical guidance for the accurate diagnosis and precise prevention of asset devaluation.

Journal of Infrastructure SystemsVol. 31(3)
Tianjin University of Technology (CN)
Sustainable cities and communities
Openalex Percentile: Top 86%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.