Evaluation approach of prefabricated components based on multi-layer complex network model combined with improved topsis method

Prefabricated buildings face greater and different prefabricated components throughout their entire lifecycle, leading to a significant increase in management difficulty. This article proposes an evaluation method based on a multi-layer complex network model combined with an improved topsis. Firstly, by combining relevant regulations, literature, and engineering experience, the factors affecting the connection of components in prefabricated building are identified and the relationships between these factors are clarified to construct a multi-layered complex network model. Secondly, complex network theory is applied to calculate and analyze the importance evaluation indicators of the model nodes. Finally, the nodes are evaluated using the entropy weight optimization topsis method, and key nodes are selected based on the comprehensive importance evaluation value, and simulation verification is carried out by attacking the nodes. A specific model is constructed and analyzed using a building in Shenzhen, Guangdong Province as an example. The study shows that:(1) By analyzing key importance evaluation metrics such as node degree, betweenness centrality, and closeness centrality, the critical nodes identified for the project are "G2," "G1," "S24," and "Q1"; (2) According to the comprehensive evaluation results using the improved topsis method, quality issues are the core cause of connection problems in prefabricated components, with the construction phase being the peak period for such issues; (3) The critical nodes play a significant role in maintaining the coordination and robustness of multi-layer complex networks, and the failure of these critical nodes undermines the network's cohesion and synergy. This study provides new insights and methods for the evaluation and management of prefabricated construction.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2025-05-07
DOI
https://doi.org/10.1371/journal.pone.0322236
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation approach of prefabricated components based on multi-layer complex network model combined with improved topsis method

Qun Wang, Tiebing Chen, Xizhen Xu, Ronghui Deng et al.
PLoS ONE
BIM and Construction Integration
article

Evaluation approach of prefabricated components based on multi-layer complex network model combined with improved topsis method

Qun Wang, Tiebing Chen, Xizhen Xu, Ronghui Deng, Xiaoxin Ding
article en

Abstract

Prefabricated buildings face greater and different prefabricated components throughout their entire lifecycle, leading to a significant increase in management difficulty. This article proposes an evaluation method based on a multi-layer complex network model combined with an improved topsis. Firstly, by combining relevant regulations, literature, and engineering experience, the factors affecting the connection of components in prefabricated building are identified and the relationships between these factors are clarified to construct a multi-layered complex network model. Secondly, complex network theory is applied to calculate and analyze the importance evaluation indicators of the model nodes. Finally, the nodes are evaluated using the entropy weight optimization topsis method, and key nodes are selected based on the comprehensive importance evaluation value, and simulation verification is carried out by attacking the nodes. A specific model is constructed and analyzed using a building in Shenzhen, Guangdong Province as an example. The study shows that:(1) By analyzing key importance evaluation metrics such as node degree, betweenness centrality, and closeness centrality, the critical nodes identified for the project are "G2," "G1," "S24," and "Q1"; (2) According to the comprehensive evaluation results using the improved topsis method, quality issues are the core cause of connection problems in prefabricated components, with the construction phase being the peak period for such issues; (3) The critical nodes play a significant role in maintaining the coordination and robustness of multi-layer complex networks, and the failure of these critical nodes undermines the network's cohesion and synergy. This study provides new insights and methods for the evaluation and management of prefabricated construction.

PLoS ONEVol. 20(5)
Shenzhen Polytechnic University (CN), Beijing Jiaotong University (CN), Jilin Jianzhu University (CN)
National Natural Science Foundation of China
Responsible consumption and production
Openalex Percentile: Top 91%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.