Evaluasi Resiko pada Konstruksi Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

The construction of the Gorontalo State Administrative Court Office Building, initiated in August 2023 and scheduled for completion in June 2024, presents significant risks due to its fluctuating nature, extensive workload, and constrained time and budget. These factors critically affect productivity, quality, and costs. This study aims to evaluate project risks and identify dominant risks using the Probability Impact Matrix (PIM) method. Data were collected through questionnaires distributed to 30 respondents and analyzed using SPSS software to ensure validity and reliability. The analysis identified 26 valid risks, with three dominant risks emerging as high-priority concerns: material price increases (risk score of 20), material availability issues (risk score of 16), and delays in material procurement (risk score of 16). These risks fall within the high-level category and require immediate mitigation to minimize their adverse impact on project timelines and financial stability. Effective risk management strategies, including supplier diversification, long-term procurement agreements, and inventory control, are essential to mitigating these risks. Additionally, proactive planning and continuous monitoring are necessary to ensure project completion within the allocated time and budget. The findings of this study provide valuable insights for project managers and stakeholders in addressing critical risk factors in high-risk construction projects. Future research should explore advanced risk assessment models and mitigation techniques to enhance construction project resilience.

Authors

Institutions

Publication Details

Journal
Research Review Jurnal Ilmiah Multidisiplin
Published
2025-03-20
DOI
https://doi.org/10.54923/researchreview.v4i1.131
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluasi Resiko pada Konstruksi Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

Moh. Yusuf Tuloli, Arfan Usman Sumaga, Fikriyanto Ome
Research Review Jurnal Ilmiah Multidisiplin
Geotechnical and construction materials studies
article

Evaluasi Resiko pada Konstruksi Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

Moh. Yusuf Tuloli, Arfan Usman Sumaga, Fikriyanto Ome
article en

Abstract

The construction of the Gorontalo State Administrative Court Office Building, initiated in August 2023 and scheduled for completion in June 2024, presents significant risks due to its fluctuating nature, extensive workload, and constrained time and budget. These factors critically affect productivity, quality, and costs. This study aims to evaluate project risks and identify dominant risks using the Probability Impact Matrix (PIM) method. Data were collected through questionnaires distributed to 30 respondents and analyzed using SPSS software to ensure validity and reliability. The analysis identified 26 valid risks, with three dominant risks emerging as high-priority concerns: material price increases (risk score of 20), material availability issues (risk score of 16), and delays in material procurement (risk score of 16). These risks fall within the high-level category and require immediate mitigation to minimize their adverse impact on project timelines and financial stability. Effective risk management strategies, including supplier diversification, long-term procurement agreements, and inventory control, are essential to mitigating these risks. Additionally, proactive planning and continuous monitoring are necessary to ensure project completion within the allocated time and budget. The findings of this study provide valuable insights for project managers and stakeholders in addressing critical risk factors in high-risk construction projects. Future research should explore advanced risk assessment models and mitigation techniques to enhance construction project resilience.

Research Review Jurnal Ilmiah MultidisiplinVol. 4(1)
State University of Gorontalo (ID)
Openalex Percentile: Top 90%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluasi Resiko pada Konstruksi Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo — Moh. Yusuf Tuloli, Arfan Usman Sumaga, et al. · Research Review Jurnal Ilmiah Multidisiplin (2025) | TGRS Research Map | TGRS