Penerapan Rekayasa Nilai (Value Engineering) Pada Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

Value Engineering is a method as an effort to save costs by changing the previous design on a particular job with a more economical design in terms of cost but still maintaining the function, quality, and value of a building. In this study, Value Engineering analysis applies six stages, namely the information stage, the function analysis stage, the creative stage, the evaluation stage, the development stage, and the presentation stage. The object of this research project is the Construction of the Gorontalo State Administration Building. The application is carried out on architectural work, namely on wall, floor, and ceiling work. The results of the study showed that there were savings on wall work of Rp. 147,273,333.24 or 6.45% of the initial cost, and on floor work there were savings of Rp. 67.430.567,75 or 6,31% of the initial cost, and on ceiling work there were savings of Rp. 8,124,051.08 or 1.14% of the initial cost. The total savings from all selected work was Rp. 222.840.013,38 or 5,48% of the initial cost of Rp. 4,063,844,279.62

Authors

Institutions

Publication Details

Journal
Research Review Jurnal Ilmiah Multidisiplin
Published
2025-02-19
DOI
https://doi.org/10.54923/researchreview.v4i1.126
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Penerapan Rekayasa Nilai (Value Engineering) Pada Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

Arfan Usman Sumaga, Mohamad Yusuf Tuloli, Nurul Amelia Pulumoduyo
Research Review Jurnal Ilmiah Multidisiplin
Value Engineering and Management
article

Penerapan Rekayasa Nilai (Value Engineering) Pada Proyek Pembangunan Gedung Kantor Pengadilan Tata Usaha Negara Gorontalo

Arfan Usman Sumaga, Mohamad Yusuf Tuloli, Nurul Amelia Pulumoduyo
article en

Abstract

Value Engineering is a method as an effort to save costs by changing the previous design on a particular job with a more economical design in terms of cost but still maintaining the function, quality, and value of a building. In this study, Value Engineering analysis applies six stages, namely the information stage, the function analysis stage, the creative stage, the evaluation stage, the development stage, and the presentation stage. The object of this research project is the Construction of the Gorontalo State Administration Building. The application is carried out on architectural work, namely on wall, floor, and ceiling work. The results of the study showed that there were savings on wall work of Rp. 147,273,333.24 or 6.45% of the initial cost, and on floor work there were savings of Rp. 67.430.567,75 or 6,31% of the initial cost, and on ceiling work there were savings of Rp. 8,124,051.08 or 1.14% of the initial cost. The total savings from all selected work was Rp. 222.840.013,38 or 5,48% of the initial cost of Rp. 4,063,844,279.62

Research Review Jurnal Ilmiah MultidisiplinVol. 4(1)
State University of Gorontalo (ID)
Openalex Percentile: Top 86%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.