Formwork is a temporary construction, serves to give the shape of a reinforced concrete construction and as a concrete bearer until the construction is strong enough. During the construction process, it must be carefully considered what type of formwork will be used. The purpose of this study is to compare the cost and duration of using conventional formwork and brick formwork and analyze the type of formwork that is appropriate for use in multi-storey buildings. The method used is the interview method to the executor to obtain information about the formwork used during the work. Data analysis starts from calculating the total volume required for floor slab and beam work. The results of the comparison analysis of the cost of implementing conventional formwork work amounted to Rp. 205,465,979, and the cost of red brick formwork work amounted to Rp. 132,519,797. with a cost difference of Rp. 72,946,182. The results of the comparative analysis of the implementation duration for conventional formwork work require a duration of 45 days, and for red brick formwork work requires a duration of 18 days with a time difference of 27 days.

Authors

Institutions

Publication Details

Journal
Research Review Jurnal Ilmiah Multidisiplin
Published
2025-02-06
DOI
https://doi.org/10.54923/researchreview.v4i1.113
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Perbandingan Penggunaan Bekisting Bata dan Bekisting Konvensional pada Pembangunan Gedung Bertingkat

Mohammad Yusuf Tuloli, Arfan Usman Sumaga, Dion Saputra Sune
Research Review Jurnal Ilmiah Multidisiplin
Geotechnical and construction materials studies
article

Analisis Perbandingan Penggunaan Bekisting Bata dan Bekisting Konvensional pada Pembangunan Gedung Bertingkat

Mohammad Yusuf Tuloli, Arfan Usman Sumaga, Dion Saputra Sune
article en

Abstract

Formwork is a temporary construction, serves to give the shape of a reinforced concrete construction and as a concrete bearer until the construction is strong enough. During the construction process, it must be carefully considered what type of formwork will be used. The purpose of this study is to compare the cost and duration of using conventional formwork and brick formwork and analyze the type of formwork that is appropriate for use in multi-storey buildings. The method used is the interview method to the executor to obtain information about the formwork used during the work. Data analysis starts from calculating the total volume required for floor slab and beam work. The results of the comparison analysis of the cost of implementing conventional formwork work amounted to Rp. 205,465,979, and the cost of red brick formwork work amounted to Rp. 132,519,797. with a cost difference of Rp. 72,946,182. The results of the comparative analysis of the implementation duration for conventional formwork work require a duration of 45 days, and for red brick formwork work requires a duration of 18 days with a time difference of 27 days.

Research Review Jurnal Ilmiah MultidisiplinVol. 4(1)
State University of Gorontalo (ID)
Openalex Percentile: Top 90%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Perbandingan Penggunaan Bekisting Bata dan Bekisting Konvensional pada Pembangunan Gedung Bertingkat — Mohammad Yusuf Tuloli, Arfan Usman Sumaga, et al. · Research Review Jurnal Ilmiah Multidisiplin (2025) | TGRS Research Map | TGRS