Study of The Influence of E-Procurement System on The Achievement of Project Progress Performance in Construction Projects Within The EPC Division - PT. PP Persero Tbk

Amid increasingly fierce competition in the construction industry due to the growing number of service providers and limited market share, achieving optimal cost performance, timely delivery, quality compliance, and zero workplace fatalities has become more challenging. To monitor project performance effectively, companies must establish Key Performance Indicators (KPIs) as benchmarks for project evaluation. One internal factor within PT. PP Persero Tbk is the centralized e-procurement system, which plays a crucial role, especially in EPC (Engineering, Procurement, and Construction) projects. Data from 2020–2022 indicates delays across centralized e-procurement processes in all projects, with procurement delayed in 7 out of 10 required steps: technical clarification, price negotiation, required negotiation evaluation documents, negotiation evaluation, objection period, contract draft review, and final contract wet signatures leading up to contract release. This highlights a suboptimal e-procurement progress performance. This study involved a survey comprising 61 variables related to the potential impact of e-procurement on progress performance, distributed among internal and external stakeholders. Validity and reliability tests were conducted prior to analysis using principal component analysis (PCA). A total of 43 respondents completed the survey. The results of the validity and reliability tests confirmed that all 61 variables were valid and reliable. PCA results identified 16 principal components, with 25 variables exhibiting positive loadings in Component 1, 18 variables in Component 2, and the remaining variables distributed across Components 3–6. The study indicates that focusing on Components 1–6 can serve as a priority framework for addressing variables to significantly improve e-procurement progress performance.

Authors

Institutions

Publication Details

Journal
Eduvest - Journal Of Universal Studies
Published
2025-05-08
DOI
https://doi.org/10.59188/eduvest.v5i4.51124
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study of The Influence of E-Procurement System on The Achievement of Project Progress Performance in Construction Projects Within The EPC Division - PT. PP Persero Tbk

Hery Wibowo, Bambang Purwanggono, Junaidi Heriyanto
Eduvest - Journal Of Universal Studies
Management and Optimization Techniques
article

Study of The Influence of E-Procurement System on The Achievement of Project Progress Performance in Construction Projects Within The EPC Division - PT. PP Persero Tbk

Hery Wibowo, Bambang Purwanggono, Junaidi Heriyanto
article en

Abstract

Amid increasingly fierce competition in the construction industry due to the growing number of service providers and limited market share, achieving optimal cost performance, timely delivery, quality compliance, and zero workplace fatalities has become more challenging. To monitor project performance effectively, companies must establish Key Performance Indicators (KPIs) as benchmarks for project evaluation. One internal factor within PT. PP Persero Tbk is the centralized e-procurement system, which plays a crucial role, especially in EPC (Engineering, Procurement, and Construction) projects. Data from 2020–2022 indicates delays across centralized e-procurement processes in all projects, with procurement delayed in 7 out of 10 required steps: technical clarification, price negotiation, required negotiation evaluation documents, negotiation evaluation, objection period, contract draft review, and final contract wet signatures leading up to contract release. This highlights a suboptimal e-procurement progress performance. This study involved a survey comprising 61 variables related to the potential impact of e-procurement on progress performance, distributed among internal and external stakeholders. Validity and reliability tests were conducted prior to analysis using principal component analysis (PCA). A total of 43 respondents completed the survey. The results of the validity and reliability tests confirmed that all 61 variables were valid and reliable. PCA results identified 16 principal components, with 25 variables exhibiting positive loadings in Component 1, 18 variables in Component 2, and the remaining variables distributed across Components 3–6. The study indicates that focusing on Components 1–6 can serve as a priority framework for addressing variables to significantly improve e-procurement progress performance.

Eduvest - Journal Of Universal StudiesVol. 5(4)
Diponegoro University (ID)
Openalex Percentile: Top 86%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.